Difference between revisions of "Jubail Refinery Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information Ownership: Saudi Aramco / Total Website: http://www.satorp.com/ Wikipage: Sartorp Jubail Refinery Location: Jubail Capacity: 20.0 million tons/annum &...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| (7 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
| − | Ownership: Saudi Aramco / Total  | + | * Ownership: Saudi Aramco / Total  | 
| − | Website: http://www.satorp.com/  | + | * Website: http://www.satorp.com/  | 
| − | Wikipage: [[Sartorp Jubail Refinery]]  | + | * Wikipage: [[Sartorp Jubail Refinery]]  | 
| − | Location: Jubail  | + | * Location: Jubail  | 
| − | Capacity: 20.0 million tons/annum & 400,000 bbl/day  | + | * Capacity: 20.0 million tons/annum & 400,000 bbl/day  | 
| − | Nelson Complexity:  | + | * Nelson Complexity:  | 
| − | Project Stage:   | + | * Project Stage: Completed 2014  | 
| − | + | * Budget: US $9.6 billion  | |
| − | Budget: US $9.6 billion  | + | === The Project ===  | 
| − | The Project  | + | * Project Type: New Greenfield Refinery  | 
| − | Project Type: New Greenfield Refinery  | + | * Project Summary: The project is a full conversion refinery, designed to process heavy local crude and produce high value white product. The refinery will be arranged in two identical trains.  | 
| − | Project Summary: The project is a full conversion refinery, designed to process heavy local crude and produce high value white product. The refinery will be arranged in two identical trains.  | + | * Main Contractors:  | 
| − | Main Contractors:  | + | ** Technip - front-end engineering design (FEED),  | 
| − | Technip - front-end engineering design (FEED),  | + | *** develop capital and operating cost estimates,  | 
| − | develop capital and operating cost estimates,  | + | *** prepare the engineering, procurement and construction (EPC) bid packages,  | 
| − | prepare the engineering, procurement and construction (EPC) bid packages,  | + | *** provide management services during the execution of the project's detailed engineering, procurement and construction phases.  | 
| − | provide management services during the execution of the project's detailed engineering, procurement and construction phases.  | + | ** Technicas Reunidas  | 
| − | Technicas Reunidas  | + | *** EPC activities for the Crude/Vacuum, Naphtha Hydrotreating, High Pressure Hydrodesulphurizers, Low Pressure Hydrodesulphurizers and Hydrogen Generation.  | 
| − | EPC activities for the Crude/Vacuum, Naphtha Hydrotreating, High Pressure Hydrodesulphurizers, Low Pressure Hydrodesulphurizers and Hydrogen Generation.  | + | ** Daelim  | 
| − | Daelim  | + | *** Daelim was awarded $820 million package 2B, for the plant to collect sulfur and acid gas.  | 
| − | Daelim was awarded $820 million package 2B, for the plant to collect sulfur and acid gas.  | + | ** DYWIDAG  | 
| − | DYWIDAG  | + | *** Coker Unit comprehends the construction of a Coke Pit with two Coke Basins, Coke Drum Structure, Coke Heater and fractionator’s foundations as well as pipe racks and road works. The main quantities are: Concrete 35,000 m3, Reinforcement 4,300 tons, Excavation 50,000 m3 and Backfilling 90,000 m3.  | 
| − | Coker Unit comprehends the construction of a Coke Pit with two Coke Basins, Coke Drum Structure, Coke Heater and fractionator’s foundations as well as pipe racks and road works. The main quantities are: Concrete 35,000 m3, Reinforcement 4,300 tons, Excavation 50,000 m3 and Backfilling 90,000 m3.  | + | ** Alderley: Crude oil metering systems  | 
| − | Alderley: Crude oil metering systems  | + | === Refining Units ===  | 
| − | Refining Units  | + | * Atmospheric Distillation  | 
| − | Atmospheric Distillation  | + | * Vacuum Distillation  | 
| − | Vacuum Distillation  | + | * Diesel Desulphurisation  | 
| − | Diesel Desulphurisation  | + | * Hydrocracker  | 
| − | Hydrocracker  | + | * Fluidised Catalytic Cracker  | 
| − | Fluidised Catalytic Cracker  | + | * Coker  | 
| − | Coker  | + | * Sulphur Recovery  | 
| − | Sulphur Recovery  | + | |
| − | Terminal Capacity  | + | === Terminal Capacity ===  | 
| − | Crude Oil:  | + | * Crude Oil:  | 
| − | Refined Products:  | + | * Refined Products:  | 
| − | Crude Supply  | + | === Crude Supply ===  | 
| − | the refinery will process Arabian Heavy  | + | * the refinery will process Arabian Heavy  | 
| − | Products Produced  | + | === Products Produced ===  | 
| − | The full-conversion refinery will maximize production of diesel and jet fuels  | + | * The full-conversion refinery will maximize production of diesel and jet fuels  | 
| − | It will also produce 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene.  | + | * It will also produce 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene.  | 
| − | History  | + | === History ===  | 
| − | 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery  | + | * 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery  | 
| − | 2006 - Technip was awarded a program management services (PMS) contract  | + | * 2006 - Technip was awarded a program management services (PMS) contract  | 
| − | Other Information  | + | * 2014 - Refinery commissioned  | 
| − | Finances totalling US$8.5 billion were secured from multiple sources including US$4.01 billion from the Public Investment Fund and Export Credit Agencies (covered and direct), and US$4.49 billion from commercial financial institutions.  | + | === Other Information ===  | 
| − | The senior loan facilities have a tenor of 16 years with an all in pricing of 1.85% (above LIBOR) for the US Dollar commercial and Export Credit Agencies (ECA) covered loan facilities.  | + | * Finances totalling US$8.5 billion were secured from multiple sources including US$4.01 billion from the Public Investment Fund and Export Credit Agencies (covered and direct), and US$4.49 billion from commercial financial institutions.  | 
| − | Sartorp   | + | * The senior loan facilities have a tenor of 16 years with an all in pricing of 1.85% (above LIBOR) for the US Dollar commercial and Export Credit Agencies (ECA) covered loan facilities.  | 
| + | * Sartorp also raised money through a Sukuk facility  | ||
=== Links ===  | === Links ===  | ||
| + | # [[Foster Wheeler Delayed Cokers]]  | ||
| + | # [[Kinetics Technology Hydrogen References]]  | ||
# [[Technip Refining References]]  | # [[Technip Refining References]]  | ||
| + | # [[Technip PMC Refining References]]  | ||
# [http://killajoules.wikidot.com/archive:alderley-dammam-deliver-metering-package-for-jubail Alderley Dammam deliver metering package for Jubail II Project]  | # [http://killajoules.wikidot.com/archive:alderley-dammam-deliver-metering-package-for-jubail Alderley Dammam deliver metering package for Jubail II Project]  | ||
# [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-award-epc-contracts-for-jubai Saudi Aramco and Total award EPC contracts for Jubail Export Refinery]  | # [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-award-epc-contracts-for-jubai Saudi Aramco and Total award EPC contracts for Jubail Export Refinery]  | ||
| Line 59: | Line 63: | ||
# [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-sign-memorandum-of-understand Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery]  | # [http://killajoules.wikidot.com/archive:saudi-aramco-and-total-sign-memorandum-of-understand Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery]  | ||
# [http://killajoules.wikidot.com/blog:3640 KBR and AYTB to Provide Long-Term Maintenance Services for SATORP Refinery in Jubail, Saudi Arabia]  | # [http://killajoules.wikidot.com/blog:3640 KBR and AYTB to Provide Long-Term Maintenance Services for SATORP Refinery in Jubail, Saudi Arabia]  | ||
| + | # [https://cma.org.sa/en/Market/Prospectuses/Documents/Satorp-Sukuk-Main-EN-Prospectus-V.23-web-Final-part2-R6.pdf Sukuk Prospectus]  | ||
| + | |||
| + | [[Category:Refinery]]  | ||
| + | [[Category:Saudi Arabia]]  | ||
| + | [[Category:Saudi Aramco]]  | ||
| + | [[Category:Total]]  | ||
Latest revision as of 09:53, 22 March 2021
Contents
Summary Information
- Ownership: Saudi Aramco / Total
 - Website: http://www.satorp.com/
 - Wikipage: Sartorp Jubail Refinery
 - Location: Jubail
 - Capacity: 20.0 million tons/annum & 400,000 bbl/day
 - Nelson Complexity:
 - Project Stage: Completed 2014
 - Budget: US $9.6 billion
 
The Project
- Project Type: New Greenfield Refinery
 - Project Summary: The project is a full conversion refinery, designed to process heavy local crude and produce high value white product. The refinery will be arranged in two identical trains.
 - Main Contractors:
- Technip - front-end engineering design (FEED),
- develop capital and operating cost estimates,
 - prepare the engineering, procurement and construction (EPC) bid packages,
 - provide management services during the execution of the project's detailed engineering, procurement and construction phases.
 
 - Technicas Reunidas
- EPC activities for the Crude/Vacuum, Naphtha Hydrotreating, High Pressure Hydrodesulphurizers, Low Pressure Hydrodesulphurizers and Hydrogen Generation.
 
 - Daelim
- Daelim was awarded $820 million package 2B, for the plant to collect sulfur and acid gas.
 
 - DYWIDAG
- Coker Unit comprehends the construction of a Coke Pit with two Coke Basins, Coke Drum Structure, Coke Heater and fractionator’s foundations as well as pipe racks and road works. The main quantities are: Concrete 35,000 m3, Reinforcement 4,300 tons, Excavation 50,000 m3 and Backfilling 90,000 m3.
 
 - Alderley: Crude oil metering systems
 
 - Technip - front-end engineering design (FEED),
 
Refining Units
- Atmospheric Distillation
 - Vacuum Distillation
 - Diesel Desulphurisation
 - Hydrocracker
 - Fluidised Catalytic Cracker
 - Coker
 - Sulphur Recovery
 
Terminal Capacity
- Crude Oil:
 - Refined Products:
 
Crude Supply
- the refinery will process Arabian Heavy
 
Products Produced
- The full-conversion refinery will maximize production of diesel and jet fuels
 - It will also produce 700,000 tons per year (t/y) of paraxylene, 140,000 t/y of benzene and 200,000 t/y of polymer-grade propylene.
 
History
- 2006 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery
 - 2006 - Technip was awarded a program management services (PMS) contract
 - 2014 - Refinery commissioned
 
Other Information
- Finances totalling US$8.5 billion were secured from multiple sources including US$4.01 billion from the Public Investment Fund and Export Credit Agencies (covered and direct), and US$4.49 billion from commercial financial institutions.
 - The senior loan facilities have a tenor of 16 years with an all in pricing of 1.85% (above LIBOR) for the US Dollar commercial and Export Credit Agencies (ECA) covered loan facilities.
 - Sartorp also raised money through a Sukuk facility
 
Links
- Foster Wheeler Delayed Cokers
 - Kinetics Technology Hydrogen References
 - Technip Refining References
 - Technip PMC Refining References
 - Alderley Dammam deliver metering package for Jubail II Project
 - Saudi Aramco and Total award EPC contracts for Jubail Export Refinery
 - Technip awarded contract for the new Jubail project in Saudi Arabia
 - Technip awarded two major contracts for the new Jubail export refinery in Saudi Arabia
 - Técnicas Reunidas is awarded a major project in the Kingdom of Saudi Arabia
 - Received an Order for the Construction of an Oil Refinery from Saudi Aramco
 - DYWIDAG, Coker Unit, Jubail, Saudi Arabia
 - Sartorp to Sell Sukuk to Saudi Investors
 - Saudi Aramco and Total sign Memorandum of Understanding for proposed Jubail export refinery
 - KBR and AYTB to Provide Long-Term Maintenance Services for SATORP Refinery in Jubail, Saudi Arabia
 - Sukuk Prospectus