(Created page with "=== Summary Information === * Ownership: Woodside * Website: http://www.woodside.com.au/ * Location: Grassy Point, BC * Capacity: 20 million tons/annum * Status: Planned ++...")
 
Line 7: Line 7:
 
* Status: Planned
 
* Status: Planned
  
+++ Brief Description
+
=== Brief Description ===
 
* The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation.  
 
* The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation.  
 
* Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.
 
* Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
 
* Constructor:
 
* Constructor:
 
* Licensor:
 
* Licensor:
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
* Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
+
* The project has been [[LNG Terminal Projects That have been Cancelled or Suspended | Cancelled]]
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
 
* Customers:  
 
* Customers:  
  
+++ History
+
=== History ===
 
* 2015 - NEB approves LNG export licence]
 
* 2015 - NEB approves LNG export licence]
 +
* 2018 - Application withdrawn
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
+++ Relevant Links
+
=== Links ===
 
# [http://www.woodside.com.au/Our-Business/GrassyPoint/Documents/Grassy%20Point_Report.pdf Project Description]
 
# [http://www.woodside.com.au/Our-Business/GrassyPoint/Documents/Grassy%20Point_Report.pdf Project Description]
 +
# [https://www.projects.eao.gov.bc.ca/p/588511f2aaecd9001b82843c/project-details Environmental Assessment]
 
# [http://killajoules.wikidot.com/blog:5722 NEB approves Woodside Energy LNG export licence]
 
# [http://killajoules.wikidot.com/blog:5722 NEB approves Woodside Energy LNG export licence]
 +
 +
[[category:LNG]]
 +
[[category:Canada]]
 +
[[category:Cancelled]]

Revision as of 11:50, 26 January 2026

Summary Information

Brief Description

  • The Grassy Point LNG facility (the Project) is planned to be constructed and operated in two distinct phases. Phase 1 of the Project involves the construction of LNG trains, with an LNG capacity of between 6 and 15 Mtpa of LNG, supporting infrastructure including jetties and a materials offloading facility, power generation, water supply, sanitary waste treatment, access roads and workforce accommodation.
  • Phase 2 is expected to involve the installation of additional LNG Trains and associated supporting infrastructure at the site up to the nominal 20 Mtpa LNG. The capacity of each train is expected to be between 3 and 6.5 Mtpa.

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2015 - NEB approves LNG export licence]
  • 2018 - Application withdrawn

Other Information

  • -

Links

  1. Project Description
  2. Environmental Assessment
  3. NEB approves Woodside Energy LNG export licence