Difference between revisions of "CATS Central Area Transmission System Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
 
Line 10: Line 10:
  
 
=== Details ===
 
=== Details ===
* CATS is the Central Area Transmission System, which delivers 12% of the UK's Gas demand through a 404 kilometre (223 mile) pipeline from the Central North Sea to the [[Teesside Gas Processing Plant TGPP]] on the North East coast of England.
+
* CATS is the Central Area Transmission System, which delivers 12% of the UK's Gas demand through a 404 kilometre (223 mile) pipeline from the Central North Sea to the [[Teesside Gas Processing Plant (TGPP)]] on the North East coast of England.
  
 
==== Related Oil and Gas Fields ====
 
==== Related Oil and Gas Fields ====

Latest revision as of 13:50, 22 January 2026

Summary Information

  • Source: Everest Oil and Gas Field in the Central North Sea
  • Destination: Teesside
  • Ownership: BG Group, BP, Eni, Conoco Phillips, Total
  • Website: https://www.catspipeline.com/
  • Length: 404 kilometre (223 mile)
  • Capacity: 48 million Standard cubic meters (1.7 billion Standard cubic feet) of Natural Gas per day
  • Status: Operating

Details

  • CATS is the Central Area Transmission System, which delivers 12% of the UK's Gas demand through a 404 kilometre (223 mile) pipeline from the Central North Sea to the Teesside Gas Processing Plant (TGPP) on the North East coast of England.

Related Oil and Gas Fields

Contractors

  • **McDermott-ETPM:** Pipeline construction
  • **Serimax:** Welding

History

  • 1993 - CATS became operational
  • 2007 - A large vessel dragged its anchor causing damage to the pipeline
  • 2011 - BP & BG Group acquired Hess stake, preempting a deal with SSE

Other Information

  • -

Links

  1. Penspen Pipeline References
  2. Serimax Pipeline References
  3. Hess Reaches Agreement for Sale of UK Gas Assets
  4. CATS Pipeline System Repair Completed
  5. Update: Acquisition of upstream gas assets