Difference between revisions of "Tampen Link Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 7: | Line 7: | ||
* Length: 131 kilometres ( miles) | * Length: 131 kilometres ( miles) | ||
* Capacity: per day | * Capacity: per day | ||
| − | * Status: | + | * Status: Operating |
=== Details === | === Details === | ||
| Line 22: | Line 22: | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
| − | [[category: | + | [[category:United Kingdom]] |
| − | [[category: | + | [[category:Gassco]] |
Latest revision as of 12:00, 22 January 2026
Summary Information
- Source: Norwegian gas system
- Destination: St Fergus terminal
- Ownership: Gassco
- Website: https://gassco.eu/
- Length: 131 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- Tampen Link connects Norway’s gas transport system with the Flags pipeline system in the UK North Sea, which runs to the SEGAL St Fergus Gas Processing Terminal in Scotland. With a diameter of 28 inches, Tampen Link is 131 km long and started up in 2010.
History
- 2010 - The pipeline began operating
Other Information
- -