Difference between revisions of "Tampen Link Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 13: | Line 13: | ||
=== History === | === History === | ||
| − | * - The pipeline began operating | + | * 2010 - The pipeline began operating |
=== Other Information === | === Other Information === | ||
Revision as of 11:59, 22 January 2026
Summary Information
- Source: Norwegian gas system
- Destination: St Fergus terminal
- Ownership: Gassco
- Website: https://gassco.eu/
- Length: 131 kilometres ( miles)
- Capacity: per day
- Status: (Operating/Planned/Under Construction)
Details
- Tampen Link connects Norway’s gas transport system with the Flags pipeline system in the UK North Sea, which runs to the SEGAL St Fergus Gas Processing Terminal in Scotland. With a diameter of 28 inches, Tampen Link is 131 km long and started up in 2010.
History
- 2010 - The pipeline began operating
Other Information
- -