Difference between revisions of "Tampen Link Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: Norwegian gas system * Destination: St Fergus terminal * Ownership: Gassco * Website: https://gassco.eu/ * Length: 131 kilometres ( mil...")
 
Line 10: Line 10:
  
 
=== Details ===
 
=== Details ===
* Tampen Link connects Norway’s gas transport system with the Flags pipeline system in the UK North Sea, which runs to the St Fergus terminal in Scotland. With a diameter of 28 inches, Tampen Link is 131 km long and started up in 2010.
+
* Tampen Link connects Norway’s gas transport system with the Flags pipeline system in the UK North Sea, which runs to the [[SEGAL St Fergus Gas Processing Terminal]] in Scotland. With a diameter of 28 inches, Tampen Link is 131 km long and started up in 2010.
  
 
=== History ===
 
=== History ===

Revision as of 11:58, 22 January 2026

Summary Information

  • Source: Norwegian gas system
  • Destination: St Fergus terminal
  • Ownership: Gassco
  • Website: https://gassco.eu/
  • Length: 131 kilometres ( miles)
  • Capacity: per day
  • Status: (Operating/Planned/Under Construction)

Details

  • Tampen Link connects Norway’s gas transport system with the Flags pipeline system in the UK North Sea, which runs to the SEGAL St Fergus Gas Processing Terminal in Scotland. With a diameter of 28 inches, Tampen Link is 131 km long and started up in 2010.

History

  • - The pipeline began operating

Other Information

  • -

Links

  1. Tampen link, Gassco