Difference between revisions of "Marsa LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 5: | Line 5: | ||
* Location: Port of Sohar, Oman | * Location: Port of Sohar, Oman | ||
* Capacity: 1.0 million tons/annum | * Capacity: 1.0 million tons/annum | ||
| − | * Status: | + | * Status: Under construction |
=== Brief Description === | === Brief Description === | ||
* A small onshore plant designed primarily to supply the bunkering market | * A small onshore plant designed primarily to supply the bunkering market | ||
| + | * The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe). | ||
=== Technical Details === | === Technical Details === | ||
| − | * Storage capacity: | + | * Storage capacity: 1 x 165,000 m3 LNG tank |
| − | * Constructor: Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train | + | * Constructor: |
| + | ** Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train | ||
| + | ** CB&I: Engineering, Procurement and Construction for the LNG tank | ||
* Licensor: | * Licensor: | ||
| Line 20: | Line 23: | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: Gas will be supplied by the Mabrouk North-East field | * Suppliers: Gas will be supplied by the Mabrouk North-East field | ||
| − | * Customers: | + | * Customers: The LNG will be sold as bunker fuel to ships |
=== History === | === History === | ||
* 2024 - Total announces FID and contracts | * 2024 - Total announces FID and contracts | ||
| + | * 2025 - Construction began on site | ||
=== Other Information === | === Other Information === | ||
| Line 31: | Line 35: | ||
# [https://lng-news.blogspot.com/2024/04/oman-totalenergies-launches-marsa-lng.html Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman] | # [https://lng-news.blogspot.com/2024/04/oman-totalenergies-launches-marsa-lng.html Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman] | ||
# [https://lng-news.blogspot.com/2024/04/technip-energies-awarded-substantial.html Technip Energies Awarded a Substantial Contract for TotalEnergies and OQ’s Marsa LNG Project in Oman] | # [https://lng-news.blogspot.com/2024/04/technip-energies-awarded-substantial.html Technip Energies Awarded a Substantial Contract for TotalEnergies and OQ’s Marsa LNG Project in Oman] | ||
| + | # [https://abarrelfull.blogspot.com/2026/01/oman-totalenergies-and-oqep-break.html Oman: TotalEnergies and OQEP break ground at Marsa LNG] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Oman]] | [[category:Oman]] | ||
[[category:Total]] | [[category:Total]] | ||
Latest revision as of 11:11, 22 January 2026
Contents
Summary Information
- Ownership: Total 80% / OQ 20%
- Website: https://totalenergies.com/
- Location: Port of Sohar, Oman
- Capacity: 1.0 million tons/annum
- Status: Under construction
Brief Description
- A small onshore plant designed primarily to supply the bunkering market
- The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe).
Technical Details
- Storage capacity: 1 x 165,000 m3 LNG tank
- Constructor:
- Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train
- CB&I: Engineering, Procurement and Construction for the LNG tank
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers: Gas will be supplied by the Mabrouk North-East field
- Customers: The LNG will be sold as bunker fuel to ships
History
- 2024 - Total announces FID and contracts
- 2025 - Construction began on site
Other Information
- -