Difference between revisions of "Marsa LNG Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* Location: Port of Sohar, Oman
 
* Location: Port of Sohar, Oman
 
* Capacity: 1.0 million tons/annum  
 
* Capacity: 1.0 million tons/annum  
* Status: Planned
+
* Status: Under construction
  
 
=== Brief Description ===
 
=== Brief Description ===
 
* A small onshore plant designed primarily to supply the bunkering market
 
* A small onshore plant designed primarily to supply the bunkering market
 +
* The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe).
  
 
=== Technical Details ===
 
=== Technical Details ===
* Storage capacity:
+
* Storage capacity: 1 x 165,000 m3 LNG tank
* Constructor:
+
* Constructor:  
 +
** Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train
 +
** CB&I: Engineering, Procurement and Construction for the LNG tank
 
* Licensor:
 
* Licensor:
  
Line 20: Line 23:
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
 
* Suppliers: Gas will be supplied by the Mabrouk North-East field
 
* Suppliers: Gas will be supplied by the Mabrouk North-East field
* Customers:  
+
* Customers: The LNG will be sold as bunker fuel to ships
  
 
=== History ===
 
=== History ===
 
* 2024 - Total announces FID and contracts
 
* 2024 - Total announces FID and contracts
 +
* 2025 - Construction began on site
  
 
=== Other Information ===
 
=== Other Information ===
Line 30: Line 34:
 
=== Links ===
 
=== Links ===
 
# [https://lng-news.blogspot.com/2024/04/oman-totalenergies-launches-marsa-lng.html Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman]
 
# [https://lng-news.blogspot.com/2024/04/oman-totalenergies-launches-marsa-lng.html Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman]
 +
# [https://lng-news.blogspot.com/2024/04/technip-energies-awarded-substantial.html Technip Energies Awarded a Substantial Contract for TotalEnergies and OQ’s Marsa LNG Project in Oman]
 +
# [https://abarrelfull.blogspot.com/2026/01/oman-totalenergies-and-oqep-break.html Oman: TotalEnergies and OQEP break ground at Marsa LNG]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Oman]]
 
[[category:Oman]]
 
[[category:Total]]
 
[[category:Total]]

Latest revision as of 11:11, 22 January 2026

Summary Information

  • Ownership: Total 80% / OQ 20%
  • Website: https://totalenergies.com/
  • Location: Port of Sohar, Oman
  • Capacity: 1.0 million tons/annum
  • Status: Under construction

Brief Description

  • A small onshore plant designed primarily to supply the bunkering market
  • The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe).

Technical Details

  • Storage capacity: 1 x 165,000 m3 LNG tank
  • Constructor:
    • Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train
    • CB&I: Engineering, Procurement and Construction for the LNG tank
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2028

Suppliers / Customers

  • Suppliers: Gas will be supplied by the Mabrouk North-East field
  • Customers: The LNG will be sold as bunker fuel to ships

History

  • 2024 - Total announces FID and contracts
  • 2025 - Construction began on site

Other Information

  • -

Links

  1. Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman
  2. Technip Energies Awarded a Substantial Contract for TotalEnergies and OQ’s Marsa LNG Project in Oman
  3. Oman: TotalEnergies and OQEP break ground at Marsa LNG