Difference between revisions of "Commonwealth LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 28: Line 28:
 
** Kimmeridge: 2 mtpa for 20 years
 
** Kimmeridge: 2 mtpa for 20 years
 
** Woodside: 2.5 mtpa for 20 years
 
** Woodside: 2.5 mtpa for 20 years
 +
** EQT Corporation: 1 mtpa for 20 years
  
 
=== History ===
 
=== History ===
Line 35: Line 36:
 
* 2023 - FID for project announced
 
* 2023 - FID for project announced
 
* 2023 - Contract awarded to Baker Hughes for turbines
 
* 2023 - Contract awarded to Baker Hughes for turbines
 +
* 2025 - Commonwealth LNG signed a Sale and Purchase Agreement (SPA) with EQT Corporation
  
 
=== Other Information ===
 
=== Other Information ===
Line 49: Line 51:
 
# [https://abarrelfull.blogspot.com/2024/02/commonwealth-lng-signs-agreements-with.html Commonwealth LNG Signs Agreements With Woodside]
 
# [https://abarrelfull.blogspot.com/2024/02/commonwealth-lng-signs-agreements-with.html Commonwealth LNG Signs Agreements With Woodside]
 
# [https://abarrelfull.blogspot.com/2024/02/commonwealth-lng-and-baker-hughes-sign.html Commonwealth LNG and Baker Hughes Sign Strategic Agreement]
 
# [https://abarrelfull.blogspot.com/2024/02/commonwealth-lng-and-baker-hughes-sign.html Commonwealth LNG and Baker Hughes Sign Strategic Agreement]
 +
# [https://abarrelfull.blogspot.com/2025/12/commonwealth-lng-signs-20-year-sale-and.html Commonwealth LNG Signs 20-Year Sale and Purchase Agreement with EQT Corporation
 +
]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:USA]]
 
[[category:USA]]
 
[[category:company]]
 
[[category:company]]

Revision as of 14:01, 11 December 2025

Summary Information

  • Ownership: Commonwealth LNG
  • Website: https://commonwealthlng.com/
  • Location: Calcasieu Ship Channel, Cameron, Louisiana
  • Capacity: 9.3 million tons/annum
  • Status: / Planned

Brief Description

  • Commonwealth LNG is an 9.3 mtpa LNG liquefaction and export facility located on the west bank of the Calcasieu Ship Channel at the mouth of the Gulf of Mexico near Cameron, Louisiana. The facility will have six 50,000 M3 modular storage tanks and will be able to accommodate vessels up to 216,000 M3. Gas supply is achieved with the addition of a 3.0-mile pipeline interconnected to two major pipeline systems, the Bridgeline Gas Pipeline System and the Kinetica Energy Express Gas Pipeline System


Technical Details

  • Storage capacity:
  • Constructor:
    • Technip: engineering services and development
    • Arup: specialist engineering services for the modular LNG storage tanks
    • Baker Hughes: Gas turbines
  • Licensor: Air Products

Ongoing Projects/Project Status

  • Commissioning is expected in 2026

Suppliers / Customers

History

  • 2018 - Contract signed with Technip for engineering services and development
  • 2019 - Application made for export licence
  • 2021 - Tender launched for sale of LNG
  • 2023 - FID for project announced
  • 2023 - Contract awarded to Baker Hughes for turbines
  • 2025 - Commonwealth LNG signed a Sale and Purchase Agreement (SPA) with EQT Corporation

Other Information

  • -

Links

  1. Long Term Applications Received by DOE/FE
  2. Project page
  3. Commonwealth LNG, LLC - FE Dkt. No. - 19-134-LNG
  4. Commonwealth LNG Selects TechnipFMC, CH-IV, Lloyds
  5. Arup appointed to advise on industry first LNG modular tank design
  6. Commonwealth LNG Launches Tender for LNG Offtake
  7. Commonwealth LNG closes on investment and agrees to terms for strategic partnership
  8. Commonwealth LNG Signs Agreements With Woodside
  9. Commonwealth LNG and Baker Hughes Sign Strategic Agreement
  10. [https://abarrelfull.blogspot.com/2025/12/commonwealth-lng-signs-20-year-sale-and.html Commonwealth LNG Signs 20-Year Sale and Purchase Agreement with EQT Corporation

]