Difference between revisions of "Golden Pass LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 20: Line 20:
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2024 | 2024]]
+
* Commissioning is expected in [[LNG Terminal Projects to be Completed in 2026 | 2026]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 32: Line 32:
 
* 2019 - Ocean LNG signs takeoff agreement
 
* 2019 - Ocean LNG signs takeoff agreement
 
* 2022 - Qatar Energy signs agreement to buy 70% of the gas volume
 
* 2022 - Qatar Energy signs agreement to buy 70% of the gas volume
 +
* 2025 - Cool down cargo arrives at the terminal
  
 
=== Other Information ===
 
=== Other Information ===
 
-
 
-
 
===  Links ===
 
===  Links ===
 +
# [[Long Term Applications Received by DOE/FE]]
 
# [[LNG Terminals Using Air Products Technology]]
 
# [[LNG Terminals Using Air Products Technology]]
 
# [[Chiyoda Acid Gas Removal References]]
 
# [[Chiyoda Acid Gas Removal References]]
Line 43: Line 45:
 
# [http://killajoules.wikidot.com/archive:ocean-lng-to-offtake-and-market-golden-pass-lng-volu Ocean LNG to offtake and market Golden Pass LNG volumes]
 
# [http://killajoules.wikidot.com/archive:ocean-lng-to-offtake-and-market-golden-pass-lng-volu Ocean LNG to offtake and market Golden Pass LNG volumes]
 
# [https://lng-news.blogspot.com/2022/11/qatarenergy-trading-to-offtake-and.html Qatarenergy trading to offtake and market 70% of LNG produced by golden pass]
 
# [https://lng-news.blogspot.com/2022/11/qatarenergy-trading-to-offtake-and.html Qatarenergy trading to offtake and market 70% of LNG produced by golden pass]
 +
# [https://lng-news.blogspot.com/2025/12/golden-pass-lng-cool-down-cargo-safely.html Golden Pass LNG Cool Down Cargo Safely Arrives in Sabine Pass: Cool Down Cargo a Major Step Toward First LNG Production]
  
 
[[category:LNG]]
 
[[category:LNG]]

Latest revision as of 13:45, 11 December 2025

Summary Information

  • Ownership: Golden Pass LNG
  • Qatar Petroleum International, (70%),
  • ExxonMobil (30%)
  • Website: http://www.goldenpasslng.com
  • Location: Port Arthur, Texas, USA
  • Capacity: 16 million tons/annum
  • Status: Planned

Brief Description

  • The proposed project would have the capacity to send out approximately 15.6 million tons of LNG per year. It involves construction of additional facilities to the existing Golden Pass LNG Terminal
  • New infrastructure required to export will be located on the existing property, which currently contains two berths for LNG tankers, five storage tanks and access to the Golden Pass pipeline.
  • The expanded facility would then have the capability and flexibility to both import and export natural gas.

Technical Details

  • Storage capacity: Tyhe project will use the five existing 155,000 cubic meter, full-containment LNG storage tanks
  • Constructor:
    • CB&I / Chiyoda: Front end engineering design (FEED) services contract
    • Chiyoda: Acid gas removal
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2026

Suppliers / Customers

  • Suppliers:
  • Customers: Ocean LNG is an international joint venture marketing company, owned by affiliates of Qatar Petroleum (70%) and ExxonMobil (30%) will buy all of the LNG

History

  • 2012 - Golden Pass applies to the DOE to be able to export natural gas to nations that have existing free trade agreements (FTA) with the United States
  • 2014 - CB&I / Chiyoda awarded FEED
  • 2019 - Final investment decision taken
  • 2019 - Ocean LNG signs takeoff agreement
  • 2022 - Qatar Energy signs agreement to buy 70% of the gas volume
  • 2025 - Cool down cargo arrives at the terminal

Other Information

-

Links

  1. Long Term Applications Received by DOE/FE
  2. LNG Terminals Using Air Products Technology
  3. Chiyoda Acid Gas Removal References
  4. Golden Pass Files Application with Department of Energy to Export LNG
  5. CB&I Announces Contract for LNG Export Facility
  6. Qatar Petroleum and ExxonMobil take “Final Investment Decision” to build a mega LNG export project in the USA
  7. Ocean LNG to offtake and market Golden Pass LNG volumes
  8. Qatarenergy trading to offtake and market 70% of LNG produced by golden pass
  9. Golden Pass LNG Cool Down Cargo Safely Arrives in Sabine Pass: Cool Down Cargo a Major Step Toward First LNG Production