Difference between revisions of "Capixaba FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Name: Capixaba FPSO * Field: Cachalote Oil Field * Country: Brazil * Ownership: SBM * Website: http://www.sbmoffshore.com/ * Field Operated By: *...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Name: Capixaba FPSO
 
* Name: Capixaba FPSO
Line 10: Line 10:
 
* Year of Completion: 2006
 
* Year of Completion: 2006
  
+++ Brief Description
+
=== Brief Description ===
  
 
* FPSO Capixaba is capable of producing 100,000 barrels of oil and 3.5 million cubic meters of gas  per day (bopd) with a storage capacity of two million barrels.
 
* FPSO Capixaba is capable of producing 100,000 barrels of oil and 3.5 million cubic meters of gas  per day (bopd) with a storage capacity of two million barrels.
 
* It is a conversion of the tanker, Stena Congress
 
* It is a conversion of the tanker, Stena Congress
* The vessel was previosuly used in the [[[Golfinho Oil Field]]] but is now in operation in the [[[Cachalote Oil Field]]]
+
* The vessel was previosuly used in the [[Golfinho Oil Field]] but is now in operation in the [[Cachalote Oil Field]]
  
+++ Contractors
+
=== Contractors ===
 
* **Keppel:** Installation and integration of topside modules; the fabrication and installation of the internal turret, flare tower, piperack and helideck; and installation of a hose reel at the stern for offloading to export vessels
 
* **Keppel:** Installation and integration of topside modules; the fabrication and installation of the internal turret, flare tower, piperack and helideck; and installation of a hose reel at the stern for offloading to export vessels
* **[[[Dyna-Mac Topsides Module Business | Dyna-Mac]]]:** Eight topside modules
+
* **[[Dyna-Mac Topsides Module Business | Dyna-Mac]]:** Eight topside modules
 
* **ABB:** Electrical Systems
 
* **ABB:** Electrical Systems
 
* **VWS Westgarth:** Water Treatment
 
* **VWS Westgarth:** Water Treatment
 
* **Kavin Engineering:**  
 
* **Kavin Engineering:**  
* Separators Design Assistance & Gas Dehydration and TEG Regeneration Package
+
** Separators Design Assistance & Gas Dehydration and TEG Regeneration Package
* Design And Engineering of Amine Sweetening Unit
+
** Design And Engineering of Amine Sweetening Unit
  
+++ Status
+
=== Status ===
 
* In operation
 
* In operation
  
+++ History
+
=== History ===
 
* 2006 - Vessel conversion completed
 
* 2006 - Vessel conversion completed
 
* 2006 - First oil produced Golfinho Field
 
* 2006 - First oil produced Golfinho Field
Line 34: Line 34:
 
* 2010 - First oil produced in the Cachalote Field
 
* 2010 - First oil produced in the Cachalote Field
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 
# [[ABB FPSO References]]
 
# [[ABB FPSO References]]
Line 51: Line 51:
 
[[Category:FPSO]]
 
[[Category:FPSO]]
 
[[Category:Brazil]]
 
[[Category:Brazil]]
 +
[[Category:SBM Offshore]]

Revision as of 16:07, 30 March 2025

Summary Information

Brief Description

  • FPSO Capixaba is capable of producing 100,000 barrels of oil and 3.5 million cubic meters of gas per day (bopd) with a storage capacity of two million barrels.
  • It is a conversion of the tanker, Stena Congress
  • The vessel was previosuly used in the Golfinho Oil Field but is now in operation in the Cachalote Oil Field

Contractors

  • **Keppel:** Installation and integration of topside modules; the fabrication and installation of the internal turret, flare tower, piperack and helideck; and installation of a hose reel at the stern for offloading to export vessels
  • ** Dyna-Mac:** Eight topside modules
  • **ABB:** Electrical Systems
  • **VWS Westgarth:** Water Treatment
  • **Kavin Engineering:**
    • Separators Design Assistance & Gas Dehydration and TEG Regeneration Package
    • Design And Engineering of Amine Sweetening Unit

Status

  • In operation

History

  • 2006 - Vessel conversion completed
  • 2006 - First oil produced Golfinho Field
  • 2008 - Contract signed for Cachalote
  • 2010 - First oil produced in the Cachalote Field

Other Information

  • -

Links

  1. ABB FPSO References
  2. Kavin Engineering FPSO References
  3. VWS Westgarth FPSO References
  4. International Protective Coatings FPSO References
  5. Keppel Shipyard successfully delivers FPSO Capixaba for SBM
  6. FPSO Capixaba begins pre-operation in the Golfinho field
  7. SBM Offshore Books A New Lease Order For Petrobras Cachalote Field
  8. FPSO Capixaba begins to operate in the Cachalote Field