* The Baleine field extends over blocks CI-101 and CI-802.  
 
* The Baleine field extends over blocks CI-101 and CI-802.  
* The FPSO Firenze, that will be renamed Baleine after its arrival in Cote d’Ivoire, has been refurbished and upgraded in order to allow it to treat up to 15,000 bbl/d of oil and around 25 Mcfd/d of associated gas.  
+
* The [[Firenze FPSO]], has been renamed [[Baleine FPSO]] after its arrival in Cote d’Ivoire, has been refurbished and upgraded in order to allow it to treat up to 15,000 bbl/d of oil and around 25 Mcfd/d of associated gas.  
 
* The entire gas production will be delivered onshore via a newly built export pipeline.
 
* The entire gas production will be delivered onshore via a newly built export pipeline.
 +
* The start of Phase 2 is expected by the end of 2024 and will increase field production to 50,000 bbl/d of oil and approximately 70 Mscf/d of associated gas.
 +
** Phase 2 will utilise the [[Petrojarl Kong FPSO]] and the Floating Storage and Offloading Unit (FSO) Yamoussoukro
 +
* The third development phase aims to elevate field production up to 150,000 bbl/d of oil and 200 Mscf/d of gas.
  
 
=== Contractors ===
 
=== Contractors ===
* Saipem:
+
* '''Saipem:'''
 
** Engineering, Procurement, Construction and Installation (EPCI) activities of Subsea Umbilicals, Risers and Flowlines (SURF) and of an onshore gas pipeline for the connection to the distribution grid
 
** Engineering, Procurement, Construction and Installation (EPCI) activities of Subsea Umbilicals, Risers and Flowlines (SURF) and of an onshore gas pipeline for the connection to the distribution grid
 
** Engineering, Procurement, Construction and Commissioning activities regarding the refurbishment of the Firenze FPSO vessel
 
** Engineering, Procurement, Construction and Commissioning activities regarding the refurbishment of the Firenze FPSO vessel
 
==== Phase 2 ====
 
==== Phase 2 ====
* Baker Hughes
+
* '''Baker Hughes:'''
 
** eight deep water trees, three Aptara™ manifolds, the relevant subsea production control system, and flexible risers and jumpers
 
** eight deep water trees, three Aptara™ manifolds, the relevant subsea production control system, and flexible risers and jumpers
  
Line 27: Line 30:
 
* 2022 - Saipem awarded major contracts
 
* 2022 - Saipem awarded major contracts
 
* 2023 - The FPSO sets sail for the Baleine Oil and Gas Field
 
* 2023 - The FPSO sets sail for the Baleine Oil and Gas Field
 +
* 2023 - First oil and gas produced
 +
* 2024 - First production from phase 2
  
 
=== Geology ===
 
=== Geology ===
Line 36: Line 41:
 
# [https://a-barrel-full.blogspot.com/2023/04/eni-celebrates-sail-away-of-fpso.html Eni Celebrates Sail Away of FPSO Firenze to Baleine Field Offshore Côte d'Ivoire]
 
# [https://a-barrel-full.blogspot.com/2023/04/eni-celebrates-sail-away-of-fpso.html Eni Celebrates Sail Away of FPSO Firenze to Baleine Field Offshore Côte d'Ivoire]
 
# [https://a-barrel-full.blogspot.com/2023/06/baker-hughes-awarded-major-subsea.html Baker Hughes Awarded Major Subsea Contract from Eni in Ivory Coast]
 
# [https://a-barrel-full.blogspot.com/2023/06/baker-hughes-awarded-major-subsea.html Baker Hughes Awarded Major Subsea Contract from Eni in Ivory Coast]
 
+
# [https://a-barrel-full.blogspot.com/2023/08/eni-starts-production-from-baleine.html Eni starts production from Baleine Field in Côte d’Ivoire with its partner PETROCI]
 +
# [https://a-barrel-full.blogspot.com/2024/12/eni-kicks-off-baleine-phase-2.html Eni kicks off Baleine Phase 2, increasing production in the offshore of Côte d'Ivoire]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:Ivory Coast]]
 
[[category:Ivory Coast]]
 
[[category:ENI]]
 
[[category:ENI]]

Latest revision as of 19:19, 30 December 2024

Summary Information

  • Operator: ENI
  • Country: Ivory Coast
  • Location: blocks CI-101 and CI-802, offshore
  • Production start: Scheduled for 2024
  • Partners: PetroCi Holding
  • Type: Oil & Gas
  • Estimated Reserves: estimated oil in place of 2.5 billion barrels and 3.3 trillion cubic feet of associated gas
  • Production Volume:

Description

  • The Baleine field extends over blocks CI-101 and CI-802.
  • The Firenze FPSO, has been renamed Baleine FPSO after its arrival in Cote d’Ivoire, has been refurbished and upgraded in order to allow it to treat up to 15,000 bbl/d of oil and around 25 Mcfd/d of associated gas.
  • The entire gas production will be delivered onshore via a newly built export pipeline.
  • The start of Phase 2 is expected by the end of 2024 and will increase field production to 50,000 bbl/d of oil and approximately 70 Mscf/d of associated gas.
    • Phase 2 will utilise the Petrojarl Kong FPSO and the Floating Storage and Offloading Unit (FSO) Yamoussoukro
  • The third development phase aims to elevate field production up to 150,000 bbl/d of oil and 200 Mscf/d of gas.

Contractors

  • Saipem:
    • Engineering, Procurement, Construction and Installation (EPCI) activities of Subsea Umbilicals, Risers and Flowlines (SURF) and of an onshore gas pipeline for the connection to the distribution grid
    • Engineering, Procurement, Construction and Commissioning activities regarding the refurbishment of the Firenze FPSO vessel

Phase 2

  • Baker Hughes:
    • eight deep water trees, three Aptara™ manifolds, the relevant subsea production control system, and flexible risers and jumpers

History

  • 2021 - Baleine Oil and Gas Field discovered
  • 2022 - Final investment decision taken
  • 2022 - Saipem awarded major contracts
  • 2023 - The FPSO sets sail for the Baleine Oil and Gas Field
  • 2023 - First oil and gas produced
  • 2024 - First production from phase 2

Geology

  • The resources are in light oil bearing intervals of Santonian and Cenomanian / Albian age. The lower Cenomanian / Albian level shows discrete to good reservoir characteristics

Links

  1. Eni announces a major oil discovery in block CI-101, offshore Ivory Coast
  2. Saipem awarded new contracts in Ivory Coast worth approximately 1 billion euro overall
  3. Eni Celebrates Sail Away of FPSO Firenze to Baleine Field Offshore Côte d'Ivoire
  4. Baker Hughes Awarded Major Subsea Contract from Eni in Ivory Coast
  5. Eni starts production from Baleine Field in Côte d’Ivoire with its partner PETROCI
  6. Eni kicks off Baleine Phase 2, increasing production in the offshore of Côte d'Ivoire