Difference between revisions of "Tennessee Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Sources: Louisiana, the Gulf of Mexico and south Texas * Destination: northeastern United States * Ownership: Kinder Morgan * Website: http://www.kinder...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Sources: Louisiana, the Gulf of Mexico and south Texas
 
* Sources: Louisiana, the Gulf of Mexico and south Texas
Line 9: Line 9:
 
* Status: Operating
 
* Status: Operating
  
+++ Details
+
=== Details ===
 
* TGP is a 13,900-mile pipeline system with a design capacity of about 7.5 billion cubic feet (Bcf) per day. It transports natural gas from Louisiana, the Gulf of Mexico and south Texas to the northeastern United States, including the metropolitan areas of New York City and Boston
 
* TGP is a 13,900-mile pipeline system with a design capacity of about 7.5 billion cubic feet (Bcf) per day. It transports natural gas from Louisiana, the Gulf of Mexico and south Texas to the northeastern United States, including the metropolitan areas of New York City and Boston
* It is supplied by the [[[Independence Trail Natural Gas Pipeline]]], [[[High Island Offshore Natural Gas Pipeline System]]], [[[Viosca Knoll Gas Pipeline System]]] and [[[Destin Gas Pipeline]]]
+
* It is supplied by the [[Constitution Gas Pipeline Company]], [[Independence Trail Natural Gas Pipeline]], [[High Island Offshore Natural Gas Pipeline System]], [[Viosca Knoll Gas Pipeline System]] and [[Destin Gas Pipeline]]
* Tennessee Gas Pipeline connects with the [[[Columbia Gas Transmission Corporation]]] at the Milford Compressor station in Pennsylvania and with [[[Gulf South Gas Pipeline System]]]
+
* Tennessee Gas Pipeline connects with the [[Columbia Gas Transmission Corporation]] at the Milford Compressor station in Pennsylvania and with [[Gulf South Gas Pipeline System]]
* It connects to the [[[Iroquois Gas Pipeline]]] at Wright , NY and to the [[[East Tennessee Natural Gas Pipeline]]]
+
* It connects to the [[Iroquois Gas Pipeline]] at Wright , NY and to the [[East Tennessee Natural Gas Pipeline]]
* The pipeline is connected to the [[[Egan Natural Gas Hub]]] and the [[[Everett Marine LNG Terminal]]]
+
* The pipeline is connected to the [[Egan Natural Gas Hub]], the [[Perryville Center Natural Gas Hub]] and the [[Everett Marine LNG Terminal]]
 +
* It can supply the [[Cameron LNG Export Terminal Project]]
 +
* There is to be an interconnect to supply the [[Driftwood LNG Export Terminal Project]]
 +
* In 2024 the Mississippi Crossing Project was launched. It is designed to transport up to 1.5 Bcf/d of natural gas and primarily involves the construction of nearly 206 miles of 42-inch and 36-inch pipeline and two new compressor stations. The project will originate near Greenville, Mississippi, and conclude near Butler, Alabama
  
+++ Contractors
+
=== Contractors ===
  
 
* **UniversalPegasus:** Project management, field survey, right-­‐of-­‐way, and mapping services for the West-­‐East Pipeline Project
 
* **UniversalPegasus:** Project management, field survey, right-­‐of-­‐way, and mapping services for the West-­‐East Pipeline Project
  
+++ History
+
=== History ===
 
* 1998 - South Pass 77 System Expansion & Tenneco /DOMAC Co Expansion completed
 
* 1998 - South Pass 77 System Expansion & Tenneco /DOMAC Co Expansion completed
 
* 1999 - LSP Electric Lateral & Reynosa/Pemex Export connection completed
 
* 1999 - LSP Electric Lateral & Reynosa/Pemex Export connection completed
Line 34: Line 37:
 
* 2013 - Northeast Upgrade Project & MPP Project
 
* 2013 - Northeast Upgrade Project & MPP Project
 
* 2014 - Rose Lake Expansion Project
 
* 2014 - Rose Lake Expansion Project
 +
* 2024 - Mississippi Crossing Project launched
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
Line 43: Line 47:
 
# [[Universalpegasus Pipeline References]]
 
# [[Universalpegasus Pipeline References]]
 
# [http://killajoules.wikidot.com/blog:2908 KMP to Purchase 100% of Tennessee Gas Pipeline and 50% of El Paso Natural Gas Pipeline for Approximately $6.22 Billion]
 
# [http://killajoules.wikidot.com/blog:2908 KMP to Purchase 100% of Tennessee Gas Pipeline and 50% of El Paso Natural Gas Pipeline for Approximately $6.22 Billion]
 +
# [https://a-barrel-full.blogspot.com/2024/12/tennessee-gas-pipeline-announces-final.html Tennessee Gas Pipeline Announces Final Investment Decision on Mississippi Crossing Project]
 +
 +
[[category:Pipeline]]
 +
[[category:USA]]
 +
[[category:Kinder Morgan]]

Latest revision as of 15:38, 28 December 2024

Summary Information

  • Sources: Louisiana, the Gulf of Mexico and south Texas
  • Destination: northeastern United States
  • Ownership: Kinder Morgan
  • Website: http://www.kindermorgan.com/
  • Length: kilometres (13,900 miles)
  • Capacity: 7.5 billion cubic feet (Bcf) per day
  • Status: Operating

Details

Contractors

  • **UniversalPegasus:** Project management, field survey, right-­‐of-­‐way, and mapping services for the West-­‐East Pipeline Project

History

  • 1998 - South Pass 77 System Expansion & Tenneco /DOMAC Co Expansion completed
  • 1999 - LSP Electric Lateral & Reynosa/Pemex Export connection completed
  • 2001 - Texas Deepwater Link, Concord Lateral Expansion & Eastern Express 2000 Zone 6 completed
  • 2002 - Stagecoach Lateral & Rhode Island Lateral completed
  • 2003 - Can-East/Leidy Extension & South Texas Export completed
  • 2005 - Tewksbury-Andover Lateral completed
  • 2007 - Triple-T Extension & Deepwater Link Project completed
  • 2009 - Expansion of Concord Lateral & Carthage Lateral completed
  • 2011 - 300 Line Expansion Project
  • 2012 - Station 230C Project & Northeast Supply Diversification Project
  • 2012 - Kinder Morgan Energy Partners, acquired a 100 % stake
  • 2013 - Northeast Upgrade Project & MPP Project
  • 2014 - Rose Lake Expansion Project
  • 2024 - Mississippi Crossing Project launched

Other Information

  • -

Links

  1. EIA Natural Gas Pipeline Projects
  2. EIA Natural Gas Pipeline Projects 2010-2014
  3. Universalpegasus Pipeline References
  4. KMP to Purchase 100% of Tennessee Gas Pipeline and 50% of El Paso Natural Gas Pipeline for Approximately $6.22 Billion
  5. Tennessee Gas Pipeline Announces Final Investment Decision on Mississippi Crossing Project