Difference between revisions of "Ruby Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Mubadala * Country: Indonesia * Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi * Production star...") |
Abarrelfull (talk | contribs) |
||
| Line 32: | Line 32: | ||
# [[Indonesia Exploration And Production Blocks]] | # [[Indonesia Exploration And Production Blocks]] | ||
# [[Serimax Asia Pipeline References]] | # [[Serimax Asia Pipeline References]] | ||
| − | # [[ | + | # [[Saipem Fixed Offshore Production Facilities Project References]] |
# [[FoundOcean Subsea References]] | # [[FoundOcean Subsea References]] | ||
# [[Serimax Asia Pipeline References]] | # [[Serimax Asia Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:ruby-field-to-start-production-in-september-2013 Ruby Field To Start Production In September 2013] | # [http://killajoules.wikidot.com/archive:ruby-field-to-start-production-in-september-2013 Ruby Field To Start Production In September 2013] | ||
# [http://killajoules.wikidot.com/archive:mubadala-petroleum-starts-production-at-the-ruby-gas Mubadala Petroleum starts production at the Ruby gas field in Indonesia] | # [http://killajoules.wikidot.com/archive:mubadala-petroleum-starts-production-at-the-ruby-gas Mubadala Petroleum starts production at the Ruby gas field in Indonesia] | ||
Latest revision as of 13:01, 22 August 2024
Summary Information
- Operator: Mubadala
- Country: Indonesia
- Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi
- Production start: 2013
- Partners: Total & Inpex
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: Expected to 100 million cubic feet oil per day
+++ Description
- The field is being developed as a tie back to the Total operated Senipah Gas and Condensate Field by a 312 kilometer-long subsea pipeline
- The development utilises a tripod wellhead platform (WHP) and the processing and quarters platform (PQP)
- Early production of Ruby Field is expected to 100 million cubic feet oil per day
- The project is classified as a marginal field with estimated production for 10 years
- Ruby Field, Sebuku Block is targeted to start flowing natural gas in September 2013
+++ Contractors
- **Saipem:** WHP and PQP Platforms - EPIC
- **Swiber:** Gas export line
- **Geocean:** Pipeline installation
- **FoundOcean:** Grouting for WHP & PQP Jackets
+++ History
- 1997 - PSC signed
- 2013 - First gas produced
+++ Geology
+++ Links
- Indonesia Exploration And Production Blocks
- Serimax Asia Pipeline References
- Saipem Fixed Offshore Production Facilities Project References
- FoundOcean Subsea References
- Serimax Asia Pipeline References
- Ruby Field To Start Production In September 2013
- Mubadala Petroleum starts production at the Ruby gas field in Indonesia