Difference between revisions of "Ruby Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Mubadala * Country: Indonesia * Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi * Production star...")
 
 
Line 32: Line 32:
 
# [[Indonesia Exploration And Production Blocks]]
 
# [[Indonesia Exploration And Production Blocks]]
 
# [[Serimax Asia Pipeline References]]
 
# [[Serimax Asia Pipeline References]]
# [[Saipem Saipem Fixed Offshore Production Facilities Major Projects]]
+
# [[Saipem Fixed Offshore Production Facilities Project References]]
 
# [[FoundOcean Subsea References]]
 
# [[FoundOcean Subsea References]]
 
# [[Serimax Asia Pipeline References]]
 
# [[Serimax Asia Pipeline References]]
 
# [http://killajoules.wikidot.com/archive:ruby-field-to-start-production-in-september-2013 Ruby Field To Start Production In September 2013]
 
# [http://killajoules.wikidot.com/archive:ruby-field-to-start-production-in-september-2013 Ruby Field To Start Production In September 2013]
 
# [http://killajoules.wikidot.com/archive:mubadala-petroleum-starts-production-at-the-ruby-gas Mubadala Petroleum starts production at the Ruby gas field in Indonesia]
 
# [http://killajoules.wikidot.com/archive:mubadala-petroleum-starts-production-at-the-ruby-gas Mubadala Petroleum starts production at the Ruby gas field in Indonesia]

Latest revision as of 13:01, 22 August 2024

Summary Information

  • Operator: Mubadala
  • Country: Indonesia
  • Location: 3.58 - Sebuku PSC, Makassar Strait between the islands of Kalimantan and Sulawesi
  • Production start: 2013
  • Partners: Total & Inpex
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume: Expected to 100 million cubic feet oil per day

+++ Description

  • The field is being developed as a tie back to the Total operated Senipah Gas and Condensate Field by a 312 kilometer-long subsea pipeline
  • The development utilises a tripod wellhead platform (WHP) and the processing and quarters platform (PQP)
  • Early production of Ruby Field is expected to 100 million cubic feet oil per day
  • The project is classified as a marginal field with estimated production for 10 years
  • Ruby Field, Sebuku Block is targeted to start flowing natural gas in September 2013

+++ Contractors

  • **Saipem:** WHP and PQP Platforms - EPIC
  • **Swiber:** Gas export line
  • **Geocean:** Pipeline installation
  • **FoundOcean:** Grouting for WHP & PQP Jackets

+++ History

  • 1997 - PSC signed
  • 2013 - First gas produced

+++ Geology

+++ Links

  1. Indonesia Exploration And Production Blocks
  2. Serimax Asia Pipeline References
  3. Saipem Fixed Offshore Production Facilities Project References
  4. FoundOcean Subsea References
  5. Serimax Asia Pipeline References
  6. Ruby Field To Start Production In September 2013
  7. Mubadala Petroleum starts production at the Ruby gas field in Indonesia