Difference between revisions of "Teal and Teal South Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: UK * Location: Central North Sea * Production start: 1996 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: Shell | * Operator: Shell | ||
* Country: UK | * Country: UK | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The development consists of Teal, Teal South & Guillemot A, all tied back to the [[Anasuria FPSO]] | * The development consists of Teal, Teal South & Guillemot A, all tied back to the [[Anasuria FPSO]] | ||
* Gas is exported via the [[Fulmar Gas Pipeline]] | * Gas is exported via the [[Fulmar Gas Pipeline]] | ||
| − | + | === Contractors === | |
* **SBM Offshore:** Turnkey FPSO project construction | * **SBM Offshore:** Turnkey FPSO project construction | ||
* **Mitsubishi:** Hull Construction | * **Mitsubishi:** Hull Construction | ||
| Line 21: | Line 21: | ||
* **KWSubsea:** Detailed design of a duplex infield pipeline | * **KWSubsea:** Detailed design of a duplex infield pipeline | ||
| − | + | === History === | |
* 1995 - Approval given for Teal, Teal South and Guillemot A | * 1995 - Approval given for Teal, Teal South and Guillemot A | ||
* 1996 - First oil produced | * 1996 - First oil produced | ||
* 2015 - Ping & Hibiscus Acquire the fields | * 2015 - Ping & Hibiscus Acquire the fields | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] | ||
Latest revision as of 10:38, 22 August 2024
Summary Information
- Operator: Shell
- Country: UK
- Location: Central North Sea
- Production start: 1996
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The development consists of Teal, Teal South & Guillemot A, all tied back to the Anasuria FPSO
- Gas is exported via the Fulmar Gas Pipeline
Contractors
- **SBM Offshore:** Turnkey FPSO project construction
- **Mitsubishi:** Hull Construction
- **AMEC:** Construction of topsides + turret
- **Aker/Heerema:** Installation of tie-backs, flexible risers, Fulmar pipeline tie-in
- **McDermott:** Subsea facilities
- **KWSubsea:** Detailed design of a duplex infield pipeline
History
- 1995 - Approval given for Teal, Teal South and Guillemot A
- 1996 - First oil produced
- 2015 - Ping & Hibiscus Acquire the fields