Difference between revisions of "Discovery Gas Pipeline System"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Source: Offshore | * Source: Offshore | ||
| Line 9: | Line 9: | ||
* Status: Operating | * Status: Operating | ||
| − | + | === Details === | |
| − | * The Discovery system, which includes an offshore natural gas gathering system, as well as the | + | * The Discovery system, which includes an offshore natural gas gathering system, as well as the [[Larose Gas Processing Plant]] and Paradis fractionation facility. |
* The pipeline has a 30-inch mainline and an 18-inch lateral | * The pipeline has a 30-inch mainline and an 18-inch lateral | ||
* It serves South Timbalier, Grand Isle, Ewing Bank, Green Canyon and Mississippi Canyon areas offshore Louisiana | * It serves South Timbalier, Grand Isle, Ewing Bank, Green Canyon and Mississippi Canyon areas offshore Louisiana | ||
| Line 16: | Line 16: | ||
** A 20-inch diameter, 215-mile subsea natural gas gathering pipeline for production from the Keathley Canyon, Walker Ridge and Green Canyon areas in the central deepwater Gulf of Mexico | ** A 20-inch diameter, 215-mile subsea natural gas gathering pipeline for production from the Keathley Canyon, Walker Ridge and Green Canyon areas in the central deepwater Gulf of Mexico | ||
| − | + | === Related Oil and Gas Fields === | |
| − | * Gas is transported from the [[Cascade Chinook Oil and Gas Field]], [[Gomez Oil | + | * Gas is transported from the [[Cascade-Chinook Oil and Gas Field]], [[Gomez Oil and Gas Fields]], [[Heidelberg Oil Field]], [[Lucius Oil Field]], [[Megalodon Oil and Gas Field]], [[Morpeth Oil and Gas Field]], [[Stampede TLP Oil and Gas Fields Development]], [[Tahiti Oil and Gas Field]] |
| − | + | === Contractors === | |
* **Saipem:** T&I for Keathley Canyon Pipeline project | * **Saipem:** T&I for Keathley Canyon Pipeline project | ||
| − | + | === History === | |
* 1997 - MAPCO Joins Texaco as partner of the project | * 1997 - MAPCO Joins Texaco as partner of the project | ||
* 1997 - FERC grants permission to build pipeline | * 1997 - FERC grants permission to build pipeline | ||
| Line 33: | Line 33: | ||
* 2015 - First gas flows on Keathley Canyon extension | * 2015 - First gas flows on Keathley Canyon extension | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
# [[Saipem Pipeline References]] | # [[Saipem Pipeline References]] | ||
# [[EIA Natural Gas Pipeline Projects]] | # [[EIA Natural Gas Pipeline Projects]] | ||
Latest revision as of 12:10, 8 August 2024
Contents
Summary Information
- Source: Offshore
- Destination: Larose natural gas processing plant, Louisiana
- Ownership: Williams
- Website:
- Length: kilometres (150 miles)
- Capacity: per day
- Status: Operating
Details
- The Discovery system, which includes an offshore natural gas gathering system, as well as the Larose Gas Processing Plant and Paradis fractionation facility.
- The pipeline has a 30-inch mainline and an 18-inch lateral
- It serves South Timbalier, Grand Isle, Ewing Bank, Green Canyon and Mississippi Canyon areas offshore Louisiana
- Keathley Canyon Connector Project:
- A 20-inch diameter, 215-mile subsea natural gas gathering pipeline for production from the Keathley Canyon, Walker Ridge and Green Canyon areas in the central deepwater Gulf of Mexico
Related Oil and Gas Fields
- Gas is transported from the Cascade-Chinook Oil and Gas Field, Gomez Oil and Gas Fields, Heidelberg Oil Field, Lucius Oil Field, Megalodon Oil and Gas Field, Morpeth Oil and Gas Field, Stampede TLP Oil and Gas Fields Development, Tahiti Oil and Gas Field
Contractors
- **Saipem:** T&I for Keathley Canyon Pipeline project
History
- 1997 - MAPCO Joins Texaco as partner of the project
- 1997 - FERC grants permission to build pipeline
- 1997 - Pipeline completed
- 2002 - Duke Energy acquired the pipeline
- 2005 - Expansion project completed
- 2008 - The pipeline was damaged in hurricane Ike
- 2012 - Keathley Canyon Connector Project launched
- 2015 - First gas flows on Keathley Canyon extension
Other Information
- -
Links
- Saipem Pipeline References
- EIA Natural Gas Pipeline Projects
- MAPCO Joins Texaco in Gulf of Mexico Natural Gas Pipeline Project
- Williams Partners L.P. Announces Return to Service of Discovery Mainline
- Texaco and MAPCO Receive FERC Approval for Construction of the Discovery Pipeline
- ChevronTexaco Closes Sale Of Discovery Pipeline System To Duke Energy Field Services
- New Long-Term Gathering, Processing, Transportation Agreements for Lucius, Hadrian South Fields Signed in Support of New Project
- Williams and DCP Midstream Partners Announce First Gas from Ultra-Deepwater Gulf of Mexico Pipeline
- Technip awarded pipeline installation contract in the Gulf of Mexico