Difference between revisions of "Hyundai Heavy Industries Pipeline References"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 3: | Line 3: | ||
*    | *    | ||
| − | + | === References ===  | |
# 1 PHASE-3 OF ‘SH’ COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 62.8 KM EPIC DEC. 1983 - MAY 1985  | # 1 PHASE-3 OF ‘SH’ COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 62.8 KM EPIC DEC. 1983 - MAY 1985  | ||
| Line 31: | Line 31: | ||
#* EPIC    | #* EPIC    | ||
#* OCT. 1993 - FEB. 1996  | #* OCT. 1993 - FEB. 1996  | ||
| − | # 12 PETROVIETNAM GAS UTILIZATION PETECHIM, VIETNAM PIPELINE : 16” X 107 KM EPIC DEC. 1993 - APR. 1995  | + | # 12 PETROVIETNAM GAS UTILIZATION PETECHIM, VIETNAM PIPELINE : 16” X 107 KM EPIC DEC. 1993 - APR. 1995 PIPELINE : 16” X 17 KM (ONSHORE)  | 
| − | PIPELINE : 16” X 17 KM (ONSHORE)  | ||
# [[Edop Oil Field]]  | # [[Edop Oil Field]]  | ||
#* GAS INJECTION PLATFORM    | #* GAS INJECTION PLATFORM    | ||
#* MOBIL PRODUCING NIGERIA ULTD. (MPNU),    | #* MOBIL PRODUCING NIGERIA ULTD. (MPNU),    | ||
#* PIPELINE : 3.6 KM EPIC JUN. 1994 - JUN. 1996  | #* PIPELINE : 3.6 KM EPIC JUN. 1994 - JUN. 1996  | ||
| − | # [[Ravva Oil   | + | # [[Ravva Oil and Gas Field]]  | 
#* COMMAND PETROLEUM, INDIA  | #* COMMAND PETROLEUM, INDIA  | ||
| − | #*   | + | #* RAVVA OIL & GAS DEVELOPMENT  PIPELINE (8 LINES) : 4”~ 20” X 113 KM    | 
#* EPIC    | #* EPIC    | ||
#* APR. 1995 - JUL. 1996  | #* APR. 1995 - JUL. 1996  | ||
Latest revision as of 10:07, 2 August 2024
Introduction
References
- 1 PHASE-3 OF ‘SH’ COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 62.8 KM EPIC DEC. 1983 - MAY 1985
 - 2 PHASE-2 OF ‘NQ’ COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 68.3 KM EPIC DEC. 1983 - APR. 1985
 - Lombo East Oil Field
- ANGOLA
 - TEXACO
 - PROSPECCAO E PRODUCAO PIPELINE : 105 KM
 - EPIC
 - DEC. 1985 - MAR. 1987
 
 - 4 INFILL “ICP” PROCESS PLATFORM COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE (13 LINES) : 100.45 KM EPIC NOV. 1986 - FEB. 1989
 - 5 INFILL “ICW” PROCESS PLATFORM COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 4.1 KM EPIC DEC. 1986 - FEB. 1989
 - Heera Oil Field
- HEERA PROCESS PLATFORM COMPLEX
 - OIL & NATURAL GAS CORPORATION LIMITED, INDIA
 - PIPELINE (10 LINES) : 6”~ 30” X 20 KM
 - EPIC
 - MAY 1988 - MAY 1990
 
 - 7 NEELAM PROCESS COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE (9 LINES) : 1.5”~ 36” X 132 KM EPIC FEB. 1992 - APR. 1994
 - 8 NQP PROCESS COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE (8 LINES) : 4”~ 30” X 102 KM EPIC MAR. 1992 - APR. 1994
 - 9 L-ABCD&E WELL PLATFORM COMPLEX OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE (6 LINES) : 4”~ 6” X 66 KM EPIC MAR. 1992 - MAY 1993
 - 10 WEIZHOU 11- 4 PIPELINES NANHAI WEST OIL CO., (NHWOC), CHINA PIPELINE : 4”~ 10” X 37.1 KM EPIC JAN. 1993 - MAY 1994
 - Bassein Oil And Gas Field
- South Bassein Hazira Trunkline
 - OIL & NATURAL GAS CORPORATION LIMITED, INDIA
 - PIPELINE : 30”~ 42” X 251.6 KM
 - EPIC
 - OCT. 1993 - FEB. 1996
 
 - 12 PETROVIETNAM GAS UTILIZATION PETECHIM, VIETNAM PIPELINE : 16” X 107 KM EPIC DEC. 1993 - APR. 1995 PIPELINE : 16” X 17 KM (ONSHORE)
 - Edop Oil Field
- GAS INJECTION PLATFORM
 - MOBIL PRODUCING NIGERIA ULTD. (MPNU),
 - PIPELINE : 3.6 KM EPIC JUN. 1994 - JUN. 1996
 
 - Ravva Oil and Gas Field
- COMMAND PETROLEUM, INDIA
 - RAVVA OIL & GAS DEVELOPMENT PIPELINE (8 LINES) : 4”~ 20” X 113 KM
 - EPIC
 - APR. 1995 - JUL. 1996
 
 - 15 PETCHBURI TERMINAL PETCHBURI TERMINAL CO., LTD., THAILAND PIPELINE (3 LINES) : 16” X 19.5KM EPIC FEB. 1996 - NOV. 1996
 - 16 HX/HY WELLHEAD PLATFORM OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 6”~ 12” X 39.1 KM EPIC MAY 1996 - DEC. 1997
 - 17 SECOND OFFSHORE OIL TERMINAL INDIAN OIL CORP. LTD., INDIA PIPELINE : 42” X 8.8 KM EPIC MAY 1996 - MAR. 1997
 - 18 B-121/119 WELLHEAD PLATFORM OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 12” X 36.7 KM EPIC JUN. 1996 - JAN. 1997
 - South West Ampa Gas Field
- BRUNEI
 - SHELL
 - DEVELOPMENT OF FACILITIES FOR AMDP-30
 - BRUNEI PIPELINE : 3 KM
 - EPIC
 - JUL. 1996 - JUN. 1997
 
 - 20 B-55 WELLHEAD PLATFORM INSTALLATION OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 16” X 77 KM EPIC OCT. 1996 - MAR. 1998
 - 21 WEIZHOU OIL FIELDS DEVELOPMENT CHINA NATIONAL OFFSHORE OIL CORP. (CNOOC), PIPELINE (5 LINES) 8”~ 24” X 132.48 KM EPIC JUN. 1997 - AUG. 1998
 
CHINA PIPELINE (5 LINES) : 21.5 M (ONSHORE)
- 22 YUNG-AN TUNG HSIAO OFFSHORE PIPELINE CHINESE PETROLEUM CORP. (CPC), TAIWAN PIPELINE : 36” X 273.7 KM EPIC FEB. 1999 - AUG. 2000
 - 23 MUMBAI PORT SUBMARINE PIPELINE MUMBAI HARBOR, WEST OF COAST, INDIA PIPELINE : 8”~ 42” X 31.2 KM EPIC FEB. 1999 - JUN. 2000
 
REPLACEMENT
- Belanak Oil And Gas Field
- WEST NATUNA BLOCK B FACILITIES
 - CONOCO INDONESIA, INC.,
 - INDONESIA
 - PIPELINE : 8”~ 4” X 42 KM (INFIELD) EPIC
 - FEB. 1999 - MAY 2001
 - SUBSEA TIE-BACK SYSTEM
 
 - CRMP-1 PIPELINE OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 4”~ 12” X 23 KM EPIC JUN. 1999 - APR. 2000
 - Bongkot Gas Field
- PTTEP,
 - THAILAND
 - BONGKOT PHASE-3B WELLHEAD PLATFORM PIPELINE : 16”~ 18” X 23 KM
 - EPIC
 - AUG. 1999 - JUN. 2001
 
 - South Pars Gas Field
- NATIONAL IRANIAN OIL COMPANY (NIOC), IRAN
 - SOUTH PARS FIELD DEVELOPMENT (PHASE-2 & 3) PIPELINE : 32” X 218.6 KM
 - EPIC
 - SEP. 1999 - JUN. 2001
 
 - 28 YOUNG-JONG-DO PIPELINE KOREA GAS CORPORATION, KOREA PIPELINE : 36” X 24.4 KM EPIC MAR. 2000 - FEB. 2001
 - 29 WATER INJECTION PIPELINES REPLACEMENT OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE (11 LINES) : 4”~ 12” X 52 KM EPIC AUG. 2000 - MAY 2001
 - Soroosh Oil Field
- SHELL EXPLORATION B.V, IRAN
 - SOROOSH-NOWROOZ EPIC-1 PIPELINE : 16” X 12 KM
 - EPIC
 - SEP. 2000 - MAR. 2002
 
 - Donghae 1 Gas Field
- KOREA NATIONAL OIL CORPORATION
 - KOREA
 - DONGHAE-1 GAS DEVELOPMENT , PIPELINE : 14” X 61 KM
 - EPIC MAR. 2001 - NOV. 2003
 - ONSHORE TERMINAL, PIPELINE : 14” X 7 KM (ONSHORE) PIPELINE : 6 ” X 4 KM (FLOWLINES)
 
 - Lakshmi Gas Field
- CAIRN ENERGY INDIA PTY. LTD.,
 - INDIA
 - LAKSHIMI FILED DEVELOPMENT PIPELINE : 24” + 12” X 36 KM
 - EPIC
 - JUL. 2001 - APR. 2002
 
 - West Seno Oil Field
- UNOCAL,
 - INDONESIA
 - WEST SENO FPU/TLP PIPELINE (2 LINES) : 12” X 6 2 KM
 - EPIC
 - AUG. 2001 - JUL. 2003
 
 - Heera Oil Field
- India
 - ONGC
 - HV Wellhead Platform - PIPELINE (4 LINES) : 8”~12” X 29.7 KM
 - EPIC
 - AUG. 2001 - NOV. 2002
 
 
35 EAST HP GAS EXPANSION PIPELINE BRUNEI SHELL PETROLEUM COMPANY, BRUNEI PIPELINE : 28” X 68.29 KM EPIC OCT. 2001 - JUL. 2002
- Bonny Island Oil Terminal
- NIGERIA
 - SHELL
 - BONNY TERMINAL INTEGRATED PROJECT
 - PIPELINE : 48” + 32” X 54 KM
 - EPIC
 - FEB. 2002 - FEB. 2005
 
 
PIPELINE
- 37 GAS TRANSMISSION AND DISTRIBUTION PT PERUSAHAAN GAS NEGARA (PESERO), PIPELINE : 28” X 215 KM EPIC MAY 2002 - OCT. 2003
 
INDONESIA
- Huizhou 19 3 2 1 Oil Field
- China
 - HUIZHOU 19-3/2/1 PLATFORM CACT-OG
 - 2 LINES) : 18” & 14” X 41.1 KM
 - EPIC
 - AUG. 2002 - JUN. 2004
 
 - 39 HANGZHOU BAY OFFSHORE PIPELINE CHINESE PETROLEUM AND CHEMICAL PIPELINE : 10”~30” X 160.5 KM EPIC FEB. 2003 - APR. 2004
 
CORPORATION (SINOPEC), CHINA
- 40 MHB PIPELINE OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 8”~12” X 46.56 KM (RIGID) EPIC MAR. 2003 - FEB. 2004
 
PIPELINE : 8” X 12.85 KM (FLEXIBLE)
- Chunxiao Gas Field
- CNOOC
 - CHINA
 - CHUNXIAO GAS COMPLEX DEVELOPMENT PIPELINE : 8”~ 28” X 471.2 KM EPIC
 - SEP. 2003 - APR. 2005
 
 - Gauri Oil And Gas Field
- CAIRN ENERGY INDIA PTY LTD.
 - INDIA
 - GAURI-A PIPELINE INSTALLATION , PIPELINE : 12” X 5.4 KM
 - IC
 - DEC. 2003 - MAR. 2004
 
 - MUT PIPELINE OIL & NATURAL GAS CORPORATION LIMITED, INDIA PIPELINE : 12”~ 30” X 506.65 KM EPIC JAN. 2004 - MAY 2005
 - Rong Doi Gas Field
- KOREA NATIONAL OIL CORPORATION,
 - VIETNAM
 - RONG DOI PLATFORM PIPELINE : 18” X 58 KM
 - EPIC SEP.
 - 2004 - SEP. 2006
 
 
++++ Links