Difference between revisions of "Petrojarl Kong FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Name: * Field: Baleine Oil and Gas Field * Country: * Ownership: * Website: * Field Operated By: ENI * Capacity: bpd * Year of Complet...")
 
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Name:  
+
* Name: Petrojarl Kong FPSO
 
* Field: [[Baleine Oil and Gas Field]]
 
* Field: [[Baleine Oil and Gas Field]]
* Country:  
+
* Country: Ivory Coast
* Ownership:  
+
* Ownership: Altera
* Website:  
+
* Website: https://www.alterainfra.com/
 
* Field Operated By: ENI
 
* Field Operated By: ENI
* Capacity: bpd  
+
* Capacity: 30,000 bpd  
 
* Year of Completion: 2024
 
* Year of Completion: 2024
  
 
=== Brief Description ===
 
=== Brief Description ===
  
* -
+
* The FPSO is a cylindrical vessel which was previous known as [[Voyageur Spirit FPSO]]
 +
* The vessel has oil processing capacity of 30,000 barrels of oil per day, gas compression of 38 million standard cubic feet per day and 48,000 barrels of water injection capacity per day.
  
 
=== Contractors ===
 
=== Contractors ===
*  
+
* '''Original Construction'''
 +
** '''Sevan Marine:''' FPSO upgrade
 +
** '''Yantai Raffles Shipyard:''' Construction of Hull
 +
** '''KANFA Aragon:''' TEG Dehydration Module
 +
* '''Refurbishment'''
 +
 
  
 
=== Status ===
 
=== Status ===
Line 21: Line 27:
  
 
=== History ===
 
=== History ===
* -
+
* 2023 - ENI signed agreement with Altera for the vessel
 +
* 2024 - The vessel set sail from Dubai
  
 
=== Other Information ===
 
=== Other Information ===
Line 28: Line 35:
  
 
=== Links ===
 
=== Links ===
 
+
# [[Jotun FPSO References]]
# [ ]
+
# [[Yantai Raffles Shipyard FPSO References]]
 +
# [https://abarrelfull.blogspot.com/2024/08/altera-awarded-contracts-with-eni-for.html Altera awarded contracts with Eni for the Baleine Field]
 +
# [https://a-barrel-full.blogspot.com/2024/07/eni-fpso-petrojarl-kong-and-fso.html Eni: FPSO Petrojarl Kong and FSO Yamoussoukro ready to leave for Côte d'Ivoire for phase 2 of Baleine project]
  
 
[[Category:FSPO]]
 
[[Category:FSPO]]
 
[[Category:Ivory Coast]]
 
[[Category:Ivory Coast]]
[[Category:Company]]
+
[[Category:Altera]]

Latest revision as of 11:12, 1 August 2024

Summary Information

Brief Description

  • The FPSO is a cylindrical vessel which was previous known as Voyageur Spirit FPSO
  • The vessel has oil processing capacity of 30,000 barrels of oil per day, gas compression of 38 million standard cubic feet per day and 48,000 barrels of water injection capacity per day.

Contractors

  • Original Construction
    • Sevan Marine: FPSO upgrade
    • Yantai Raffles Shipyard: Construction of Hull
    • KANFA Aragon: TEG Dehydration Module
  • Refurbishment


Status

  • -

History

  • 2023 - ENI signed agreement with Altera for the vessel
  • 2024 - The vessel set sail from Dubai

Other Information

  • -

Links

  1. Jotun FPSO References
  2. Yantai Raffles Shipyard FPSO References
  3. Altera awarded contracts with Eni for the Baleine Field
  4. Eni: FPSO Petrojarl Kong and FSO Yamoussoukro ready to leave for Côte d'Ivoire for phase 2 of Baleine project