Difference between revisions of "Joetsu LNG terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Inpex * Website: http://www.inpex.co.jp/ * Location: Naoetsu in Joetsu city, Niigata Prefecture, Japan * Capacity: 1.5 million tons/annum *...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Inpex | * Ownership: Inpex | ||
Line 7: | Line 7: | ||
* Status: In operation | * Status: In operation | ||
− | + | === Brief Description === | |
* The main facilitites of the Terminal include two above-ground LNG tanks with the storage capacity of 180,000kl, a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload, and vaporizers and calorific value adjustment facilities. The Terminal’s capacity to receive and regas LNG is approximately 1.5 million tonnes per year | * The main facilitites of the Terminal include two above-ground LNG tanks with the storage capacity of 180,000kl, a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload, and vaporizers and calorific value adjustment facilities. The Terminal’s capacity to receive and regas LNG is approximately 1.5 million tonnes per year | ||
− | + | === Technical Details === | |
* Storage capacity: 180,000-kl tank x 2 | * Storage capacity: 180,000-kl tank x 2 | ||
* Unloading capacity: a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload | * Unloading capacity: a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** **Chiyoda:** EPC | |
− | + | ** **Freyssinet:** Pre-stressing for LNG tanks | |
− | + | === Ongoing Projects/Project Status === | |
− | * The project was completed in December | + | * The project was completed in December [[LNG Terminals to be Completed in 2013 | 2013]] |
− | + | === Suppliers / Customers === | |
* Suppliers: Inpex are considering whether to import LNG produced from Ichthys (Australia) or Abadi (Indonesia), | * Suppliers: Inpex are considering whether to import LNG produced from Ichthys (Australia) or Abadi (Indonesia), | ||
* Customers: Gas will be supplied mainly to the city gas enterprises and commercial/industrial customers in the Tokyo metropolitan area | * Customers: Gas will be supplied mainly to the city gas enterprises and commercial/industrial customers in the Tokyo metropolitan area | ||
− | + | === History === | |
* 2008 - Project launched with FID | * 2008 - Project launched with FID | ||
* 2009 - Construction Start of Naoetsu LNG Receiving Terminal | * 2009 - Construction Start of Naoetsu LNG Receiving Terminal | ||
Line 33: | Line 33: | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
− | # | + | # [[Chiyoda LNG References]] |
− | # | + | # [[Freyssinet LNG Tank References]] |
# [http://killajoules.wikidot.com/archive:construction-of-an-lng-receiving-terminal-at-naoetsu Construction of an LNG receiving terminal at Naoetsu, Japan] | # [http://killajoules.wikidot.com/archive:construction-of-an-lng-receiving-terminal-at-naoetsu Construction of an LNG receiving terminal at Naoetsu, Japan] | ||
# [http://www.inpex.co.jp/english/news/pdf/2011/e20110523-c.pdf Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan] | # [http://www.inpex.co.jp/english/news/pdf/2011/e20110523-c.pdf Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan] | ||
Line 44: | Line 44: | ||
# [http://killajoules.wikidot.com/blog:4477 Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan] | # [http://killajoules.wikidot.com/blog:4477 Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan] | ||
# [http://killajoules.wikidot.com/blog:4807 Start-up of Naoetsu LNG Terminal, Japan] | # [http://killajoules.wikidot.com/blog:4807 Start-up of Naoetsu LNG Terminal, Japan] | ||
+ | |||
+ | [[category:LNG]] | ||
+ | [[category:Japan]] | ||
+ | [[category:Inpex]] |
Revision as of 06:08, 1 August 2024
Contents
Summary Information
- Ownership: Inpex
- Website: http://www.inpex.co.jp/
- Location: Naoetsu in Joetsu city, Niigata Prefecture, Japan
- Capacity: 1.5 million tons/annum
- Status: In operation
Brief Description
- The main facilitites of the Terminal include two above-ground LNG tanks with the storage capacity of 180,000kl, a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload, and vaporizers and calorific value adjustment facilities. The Terminal’s capacity to receive and regas LNG is approximately 1.5 million tonnes per year
Technical Details
- Storage capacity: 180,000-kl tank x 2
- Unloading capacity: a berth which enables the 210,000m3 loading class LNG tanker (Q-flex) to unload
- Send out capacity:
- Constructor:
- **Chiyoda:** EPC
- **Freyssinet:** Pre-stressing for LNG tanks
Ongoing Projects/Project Status
- The project was completed in December 2013
Suppliers / Customers
- Suppliers: Inpex are considering whether to import LNG produced from Ichthys (Australia) or Abadi (Indonesia),
- Customers: Gas will be supplied mainly to the city gas enterprises and commercial/industrial customers in the Tokyo metropolitan area
History
- 2008 - Project launched with FID
- 2009 - Construction Start of Naoetsu LNG Receiving Terminal
- 2013 - First LNG cargo arrived
- 2013 - Commercial operations began
Other Information
- -
Links
- Chiyoda LNG References
- Freyssinet LNG Tank References
- Construction of an LNG receiving terminal at Naoetsu, Japan
- Construction Start of Naoetsu LNG Receiving Terminal in Niigata, Japan
- Financial Results for the six months ended September 30, 2008
- Arrival of the First LNG (Liquefied Natural Gas) Carrier at Naoetsu LNG Terminal, Japan
- Start-up of Naoetsu LNG Terminal, Japan