Difference between revisions of "Barracuda P-43 FPSO"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Name: Barracuda P 43 FPSO
 
* Name: Barracuda P 43 FPSO
Line 10: Line 10:
 
* Year of Completion:  
 
* Year of Completion:  
  
+++ Brief Description
+
=== Brief Description ===
  
 
* The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
 
* The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
 
* The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent
 
* The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent
  
+++ Contractors
+
=== Contractors ===
* **KBR:** Lump Sum EPC contract
+
* '''KBR:''' Lump Sum EPC contract
* **Jurong Shipyard:**
+
* '''Jurong Shipyard:'''
 
** FPSO conversion
 
** FPSO conversion
 
** Fabrication of topside production modules  
 
** Fabrication of topside production modules  
 
** Integration of the Barracuda topside production modules with its newly-converted hull
 
** Integration of the Barracuda topside production modules with its newly-converted hull
* **ABB:** Electrical Systems
+
* '''ABB:''' Electrical Systems
* **Jotun:** Painting
+
* '''Jotun:''' Painting
  
+++ Status
+
=== Status ===
 
* In operation
 
* In operation
  
+++ History
+
=== History ===
 
* 2001 - Jurong Shipyard secured the FPSO conversion project
 
* 2001 - Jurong Shipyard secured the FPSO conversion project
 
* 2005 - Production began
 
* 2005 - Production began
  
+++ Other Information
+
=== Other Information ===
  
 
* -
 
* -
  
+++ Links
+
=== Links ===
  
 
# [[ABB FPSO References]]
 
# [[ABB FPSO References]]

Latest revision as of 16:38, 30 July 2024

Summary Information

  • Name: Barracuda P 43 FPSO
  • Field: Barracuda Oil Field
  • Country: Brazil
  • Ownership: Petrobras
  • Website:
  • Field Operated By: Petrobras
  • Capacity: 150,000 bpd
  • Year of Completion:

Brief Description

  • The vessel has capacity to produce 150,000 barrels per day of oil plus gas compression capacity of 6 million m3/d. It is equipped with water injection capacity of 40,000 m3/d and can accommodate 100 personnel offshore.
  • The P-43 project involved the conversion of the 270,000 dwt VLCC Stena Continent

Contractors

  • KBR: Lump Sum EPC contract
  • Jurong Shipyard:
    • FPSO conversion
    • Fabrication of topside production modules
    • Integration of the Barracuda topside production modules with its newly-converted hull
  • ABB: Electrical Systems
  • Jotun: Painting

Status

  • In operation

History

  • 2001 - Jurong Shipyard secured the FPSO conversion project
  • 2005 - Production began

Other Information

  • -

Links

  1. ABB FPSO References
  2. Jotun FPSO References
  3. Jurong Shipyard secured a US$80 million FPSO conversion project
  4. Jurong Shipyard's Brazillian Joint Venture Secures First Contract Of S$270 Million
  5. Halliburton Announces Significant Achievement in Barracuda-Caratinga Project