Difference between revisions of "Mississippi Canyon Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: West Delta 143 Platform * Destination: * Ownership: Enbridge * Website: http://www.enbridge.com/ * Length: kilometres (43 miles) * Capacity:...") |
Abarrelfull (talk | contribs) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Source: West Delta 143 Platform | * Source: West Delta 143 Platform | ||
| Line 9: | Line 9: | ||
* Status: Operating | * Status: Operating | ||
| − | + | === Details === | |
| − | * Transports production gathered from the [[Mars Oil | + | * Transports production gathered from the [[Mars Oil and Gas Field]], [[Mensa Offshore Gas Field]] and [[Ursa Oil and Gas Field]] in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform. |
* Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore. | * Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore. | ||
| − | + | === History === | |
* 1996 - Pipeline completed | * 1996 - Pipeline completed | ||
| − | + | === Other Information === | |
* - | * - | ||
| − | + | === Links === | |
| − | # | + | # [[EIA Natural Gas Pipeline Projects]] |
| + | # [[Fiberbond North America Offshore Platform References]] | ||
Latest revision as of 09:13, 16 July 2024
Summary Information
- Source: West Delta 143 Platform
- Destination:
- Ownership: Enbridge
- Website: http://www.enbridge.com/
- Length: kilometres (43 miles)
- Capacity: 800 (MMcf/d)
- Status: Operating
Details
- Transports production gathered from the Mars Oil and Gas Field, Mensa Offshore Gas Field and Ursa Oil and Gas Field in the Mississippi Canyon Area of the Gulf of Mexico Outer Continental Shelf and delivered to Mississippi Canyon Gas Pipeline at West Delta 143 Platform.
- Extends from West Delta Block 143 to interconnects with the Venice Gas Plant and 2 interstate pipelines onshore.
History
- 1996 - Pipeline completed
Other Information
- -