Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Italy * Location: Adriatic * Production start: 2010 * Partners: * Type: Gas * Estimated Reserves: 10 billion cubic metres * P...") |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: ENI | * Operator: ENI | ||
* Country: Italy | * Country: Italy | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The “Annamaria‘ field extends between Italy and Croatia, 60 kilometres from the coast and at a depth of about 60 metres. It is the first cross-border field to be put into production in the Adriatic | * The “Annamaria‘ field extends between Italy and Croatia, 60 kilometres from the coast and at a depth of about 60 metres. It is the first cross-border field to be put into production in the Adriatic | ||
* It has twin platforms, “Annamaria A" on the Croatian side and “Annamaria B" on the Italian side | * It has twin platforms, “Annamaria A" on the Croatian side and “Annamaria B" on the Italian side | ||
| Line 15: | Line 15: | ||
* Annamaria B is connected to 6 producing wells | * Annamaria B is connected to 6 producing wells | ||
| − | + | === Contractors === | |
* The platforms were built by a consortium consisting of Rosetti Marino, Saipem Energy Services and Intermare Sarda in the Italian yards; Marina di Ravenna and Arbatax, and the Rijeka yard in Croatia | * The platforms were built by a consortium consisting of Rosetti Marino, Saipem Energy Services and Intermare Sarda in the Italian yards; Marina di Ravenna and Arbatax, and the Rijeka yard in Croatia | ||
* **Viktor Lenac:** Annamaria A - Gas production platform | * **Viktor Lenac:** Annamaria A - Gas production platform | ||
* **Saipem:** | * **Saipem:** | ||
| − | + | ** Annamaria A/B Basic Design and Detail Design | |
| − | + | ** Transport & Installation of Annamaria A & B platform, topside and sealines | |
| − | + | === History === | |
* 2002 - ENI signed an agreement for the development of the field | * 2002 - ENI signed an agreement for the development of the field | ||
* 2009 - Platform installed | * 2009 - Platform installed | ||
* 2010 - First gas produced | * 2010 - First gas produced | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [[Offshore Platforms in Italy]] | # [[Offshore Platforms in Italy]] | ||
Latest revision as of 11:12, 15 July 2024
Summary Information
- Operator: ENI
- Country: Italy
- Location: Adriatic
- Production start: 2010
- Partners:
- Type: Gas
- Estimated Reserves: 10 billion cubic metres
- Production Volume:
Description
- The “Annamaria‘ field extends between Italy and Croatia, 60 kilometres from the coast and at a depth of about 60 metres. It is the first cross-border field to be put into production in the Adriatic
- It has twin platforms, “Annamaria A" on the Croatian side and “Annamaria B" on the Italian side
- The gas is transported via an underwater pipeline to the Fano treatment plant, roughly 70 kilometres away, to be fed into the national distribution network.
- Annamaria B is connected to 6 producing wells
Contractors
- The platforms were built by a consortium consisting of Rosetti Marino, Saipem Energy Services and Intermare Sarda in the Italian yards; Marina di Ravenna and Arbatax, and the Rijeka yard in Croatia
- **Viktor Lenac:** Annamaria A - Gas production platform
- **Saipem:**
- Annamaria A/B Basic Design and Detail Design
- Transport & Installation of Annamaria A & B platform, topside and sealines
History
- 2002 - ENI signed an agreement for the development of the field
- 2009 - Platform installed
- 2010 - First gas produced
Geology
Links
- Offshore Platforms in Italy
- Tecon Platform References
- Viktor Lenac Platform References
- Rosetti Marino Platform References
- Saipem Fixed Offshore Production Facilities Engineering Refe
- Saipem Europe Fixed Offshore Production Facilities Project R
- Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters
- Eni starts production on the Italian section of the Annamaria field, off the Marche coast