Line 10: | Line 10: | ||
* Year of Completion: 2005 | * Year of Completion: 2005 | ||
− | + | === Brief Description === | |
* The vessel measures 892-ft in length, 150-ft wide with a 89-ft draft and is equipped with storage of approximately one million barrels of oil and topsides processing capacities of 100 000b/d of oil, 150 million scf/d of gas, 180 000b/d of water and 270 000b/d of water injection and is moored on a disconnectable turret. | * The vessel measures 892-ft in length, 150-ft wide with a 89-ft draft and is equipped with storage of approximately one million barrels of oil and topsides processing capacities of 100 000b/d of oil, 150 million scf/d of gas, 180 000b/d of water and 270 000b/d of water injection and is moored on a disconnectable turret. | ||
− | + | === Contractors === | |
− | * | + | * '''Maersk Contractors:''' Front-End Engineering Design (FEED) contract for the FPSO |
− | * | + | * '''Samsung Heavy Industries:''' Contract to build the floating production, storage, and offloading (FPSO) vessel hull |
− | * | + | * '''SBM IMODCO:''' Contract for the design and fabrication of the turret and mooring system |
− | * | + | * '''Kiewit:''' $774 million lump-sum, fixed-price-and-date contract for engineering, procuring and constructing (EPC) the 11,000-tonne White Rose FPSO (Floating, Production, Storage, Offloading) topsides |
− | + | === Status === | |
− | |||
* In operation | * In operation | ||
− | + | === History === | |
* 2000 - Maersk Contractors Newfoundland Limited was awarded the Front-End Engineering Design (FEED) contract for the FPSO | * 2000 - Maersk Contractors Newfoundland Limited was awarded the Front-End Engineering Design (FEED) contract for the FPSO | ||
* 2002 - Topsides contract awarded | * 2002 - Topsides contract awarded | ||
Line 30: | Line 29: | ||
* 2005 - Vessel completed | * 2005 - Vessel completed | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [[Samsung FPSO References]] | # [[Samsung FPSO References]] |
Latest revision as of 12:42, 11 July 2024
Contents
Summary Information
- Name: Sea Rose FPSO
- Field: White Rose Oil Field
- Country: Canada
- Ownership: Husky
- Website:
- Field operated By: Husky
- Capacity: 100,000 bpd
- Year of Completion: 2005
Brief Description
- The vessel measures 892-ft in length, 150-ft wide with a 89-ft draft and is equipped with storage of approximately one million barrels of oil and topsides processing capacities of 100 000b/d of oil, 150 million scf/d of gas, 180 000b/d of water and 270 000b/d of water injection and is moored on a disconnectable turret.
Contractors
- Maersk Contractors: Front-End Engineering Design (FEED) contract for the FPSO
- Samsung Heavy Industries: Contract to build the floating production, storage, and offloading (FPSO) vessel hull
- SBM IMODCO: Contract for the design and fabrication of the turret and mooring system
- Kiewit: $774 million lump-sum, fixed-price-and-date contract for engineering, procuring and constructing (EPC) the 11,000-tonne White Rose FPSO (Floating, Production, Storage, Offloading) topsides
Status
- In operation
History
- 2000 - Maersk Contractors Newfoundland Limited was awarded the Front-End Engineering Design (FEED) contract for the FPSO
- 2002 - Topsides contract awarded
- 2004 - Husky Energy's SeaRose FPSO Arrives in Marystown
- 2005 - Vessel completed
Other Information
- -