Difference between revisions of "Ross and Blake Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Talisman * Country: UK * Location: 64 miles from Aberdeen in the Outer Moray Firth * Production start: 1999 * Partners: BG Group * Type: Oil &...") |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Repsol |
* Country: UK | * Country: UK | ||
* Location: 64 miles from Aberdeen in the Outer Moray Firth | * Location: 64 miles from Aberdeen in the Outer Moray Firth | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The fields are produced using the [[Bleo Holm FPSO]], which is located on the Ross Field | * The fields are produced using the [[Bleo Holm FPSO]], which is located on the Ross Field | ||
* Gas is transported to the [[FUKA St Fergus Gas Processing Terminal]] by the [[Frigg UK Gas Pipeline System]] | * Gas is transported to the [[FUKA St Fergus Gas Processing Terminal]] by the [[Frigg UK Gas Pipeline System]] | ||
− | * The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the FPSO | + | * The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the [[Bleo Holm FPSO]] |
* The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold | * The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold | ||
+ | * A satellite field '''Tain''' is under consideration. The development concept includes two deviated production wells, with production routed to the Bleo Holm FPSO via a new 19 km pipeline with associated gas lift line and control/chemical injection umbilical | ||
− | + | === Contractors === | |
− | * | + | * '''McNulty Offshore:''' FPSO conversion |
− | * | + | * '''Coflexip Stena:''' offshore facilities |
− | * | + | * '''Santa Fe:''' drilling |
− | + | ==== Blake Flank ==== | |
− | * | + | * '''Technip:''' Design, fabrication and installation of the subsea flowlines and umbilicals |
− | * | + | * '''Kvaerner:''' The subsea controls |
− | * | + | * '''Cameron Cooper:''' Subsea Christmas trees |
− | * | + | * '''Santa Fe:''' drilling |
− | + | === History === | |
* 1997 - Ross Project development approved by UK Government | * 1997 - Ross Project development approved by UK Government | ||
* 1999 - The Ross field came onstream | * 1999 - The Ross field came onstream | ||
Line 33: | Line 34: | ||
* 2002 - Blake Flank project approved | * 2002 - Blake Flank project approved | ||
* 2003 - Blake Flank came onstream | * 2003 - Blake Flank came onstream | ||
+ | * 2015 - Repsol became a partner by acquiring Talisman Sinopec | ||
+ | * 2020 - Repsol launched consultation on the Tain development | ||
− | + | === Geology === | |
− | |||
* The main Blake reservoir is a thick channel sand | * The main Blake reservoir is a thick channel sand | ||
− | + | === Links === | |
# [[Bibby Offshore Subsea References]] | # [[Bibby Offshore Subsea References]] | ||
# [http://killajoules.wikidot.com/archive:talisman-announces-blake-field-development-approval Talisman Announces Blake Field Development Approval] | # [http://killajoules.wikidot.com/archive:talisman-announces-blake-field-development-approval Talisman Announces Blake Field Development Approval] | ||
Line 46: | Line 48: | ||
# [http://killajoules.wikidot.com/archive:blake-flank-oil-development-receives-dti-go-ahead Blake Flank Oil Development Receives DTI Go-Ahead] | # [http://killajoules.wikidot.com/archive:blake-flank-oil-development-receives-dti-go-ahead Blake Flank Oil Development Receives DTI Go-Ahead] | ||
# [http://killajoules.wikidot.com/archive:bg-announces-first-production-from-blake-flank-oil-d BG announces first production from Blake Flank oil development] | # [http://killajoules.wikidot.com/archive:bg-announces-first-production-from-blake-flank-oil-d BG announces first production from Blake Flank oil development] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/repsol-reaches-agreement-with-talisman.html Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company] | ||
+ | # [https://abarrelfull.blogspot.com/2024/07/proposed-development-of-tain-field.html Proposed development of the Tain field] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:UK]] | ||
+ | [[category:Repsol]] |
Latest revision as of 06:57, 10 July 2024
Contents
Summary Information
- Operator: Repsol
- Country: UK
- Location: 64 miles from Aberdeen in the Outer Moray Firth
- Production start: 1999
- Partners: BG Group
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The fields are produced using the Bleo Holm FPSO, which is located on the Ross Field
- Gas is transported to the FUKA St Fergus Gas Processing Terminal by the Frigg UK Gas Pipeline System
- The Blake development comprises six production wells drilled from a single drill centre, and two water injection wells, north-west and south-east of this drill centre; a production manifold, subsea wellheads and flowlines of 9.5 km connecting it to the Bleo Holm FPSO
- The Blake Flank development comprises two production wells and a single water injector tied into the existing Blake Production Manifold
- A satellite field Tain is under consideration. The development concept includes two deviated production wells, with production routed to the Bleo Holm FPSO via a new 19 km pipeline with associated gas lift line and control/chemical injection umbilical
Contractors
- McNulty Offshore: FPSO conversion
- Coflexip Stena: offshore facilities
- Santa Fe: drilling
Blake Flank
- Technip: Design, fabrication and installation of the subsea flowlines and umbilicals
- Kvaerner: The subsea controls
- Cameron Cooper: Subsea Christmas trees
- Santa Fe: drilling
History
- 1997 - Ross Project development approved by UK Government
- 1999 - The Ross field came onstream
- 2000 - Blake Project development approved by UK Government
- 2001 - Production started on the Blake field
- 2002 - Blake Flank project approved
- 2003 - Blake Flank came onstream
- 2015 - Repsol became a partner by acquiring Talisman Sinopec
- 2020 - Repsol launched consultation on the Tain development
Geology
- The main Blake reservoir is a thick channel sand
Links
- Bibby Offshore Subsea References
- Talisman Announces Blake Field Development Approval
- FPSO technology benefits Ross and Blake oil fields
- Blake Oil Field On Stream Ahead Of Schedule
- The Blake Field, Offshore Petroleum Production And Pipe-Lines (Assessment Of Environmental Effects) Regulations 1999 Licences P 101, P 729 And P 810 - Licences Having Effect Under The Petroleum Act 1998
- Blake Flank Oil Development Receives DTI Go-Ahead
- BG announces first production from Blake Flank oil development
- Repsol reaches an agreement with Talisman Energy to acquire the Canadian oil company
- Proposed development of the Tain field