Difference between revisions of "Calhoun LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: * Website: http://www.calhounlng.com/ * Location: Port Lavaca – Point Comfort, Texas * Capacity: 7.2 million tons/annum * Status: LNG...")
 
 
Line 15: Line 15:
 
* Send out capacity: 1.0 billion cubic feet (Bcf) per day
 
* Send out capacity: 1.0 billion cubic feet (Bcf) per day
 
* Constructor:
 
* Constructor:
* TGE Gas Engineering: Front End and Engineering Design Services (FEED)
+
** TGE Gas Engineering: Front End and Engineering Design Services (FEED)
  
  
Line 25: Line 25:
 
* Suppliers:  
 
* Suppliers:  
 
* Customers:  
 
* Customers:  
* The proposed Point Comfort Pipeline originating at the terminal will include 27 miles of 36-inch pipeline, and will connect with nine major pipelines including 5 interstate and 4 intrastate pipeline systems serving Texas and the Midwest, Northeast, and Southeast regions of the country.  
+
** The proposed Point Comfort Pipeline originating at the terminal will include 27 miles of 36-inch pipeline, and will connect with nine major pipelines including 5 interstate and 4 intrastate pipeline systems serving Texas and the Midwest, Northeast, and Southeast regions of the country.  
  
  

Latest revision as of 15:44, 5 July 2024

Summary Information

+++ Brief Description

  • A large scale LNG regasification terminal

+++ Technical Details

  • Storage capacity: 2 x 160,000 m³
  • Unloading capacity: Marine docking facilities with single berth capable of mooring and unloading LNG carriers in the class 75,000 m³ to 220,000 m³
  • Send out capacity: 1.0 billion cubic feet (Bcf) per day
  • Constructor:
    • TGE Gas Engineering: Front End and Engineering Design Services (FEED)


+++ Ongoing Projects/Project Status

+++ Suppliers / Customers

  • Suppliers:
  • Customers:
    • The proposed Point Comfort Pipeline originating at the terminal will include 27 miles of 36-inch pipeline, and will connect with nine major pipelines including 5 interstate and 4 intrastate pipeline systems serving Texas and the Midwest, Northeast, and Southeast regions of the country.


+++ History

  • 2005 - Tractabel awarded FEED
  • 2006 - FERC prepared the draft Environmental Impact Statement (EIS)
  • 2007 - Kogas signed an MOU to become a partner
  • 2007 - FERC awards permission for the project
  • 2012 - FERC revokes permission for the project

+++ Other Information

  • -

+++ Relevant Links

  1. Tractebel Engineering LNG References
  2. 2 x 160,000 m³ LNG Receiving Terminal, Calhoun - USA
  3. KOGAS, LG International, and EMS Group join forces with Gulf Coast LNG Partners, LP in the Calhoun LNG Project
  4. Notice of Availability of the Draft Environmental Impact Statement
  5. Order Vacating Section 3 Authorization and Certificate Authorization for Calhoun LNG