Difference between revisions of "West Sole Area Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 18: | Line 18: | ||
=== History === | === History === | ||
+ | * 1967 - Approval granted for development | ||
+ | * 1993 - Hyde Platform installed | ||
* 2001 - Approval granted for Hoton | * 2001 - Approval granted for Hoton | ||
+ | * 2012 - Perenco acquired the fields from BP | ||
=== Geology === | === Geology === | ||
Line 25: | Line 28: | ||
=== Links === | === Links === | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
+ | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
+ | # [https://abarrelfull.blogspot.com/2024/06/bp-agrees-sale-of-southern-gas-assets.html BP agrees sale of southern gas assets to Perenco] | ||
Latest revision as of 07:11, 1 July 2024
Summary Information
- Operator: Perenco
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The West Sole Alpha platform consists of steel legged platforms, which includes process facilities and accommodation and receives gas and fluids from all of the associated tie-backs.
- Processed gas and some fluids are routed to the onshore Dimlington Gas Terminal located on the Yorkshire coast via a 71.9 kilometre 16 inch diameter pipeline (PL28), through the West Sole Alpha platform through a 68 kilometre 24 inch diameter pipeline (PL145) and through the Amethyst A2D platform via a 47.7km 30 inch diameter pipeline (PL649).
- Hyde, Hoton and Amethyst are tied back to the West Sole Hub
Contractors
- -
History
- 1967 - Approval granted for development
- 1993 - Hyde Platform installed
- 2001 - Approval granted for Hoton
- 2012 - Perenco acquired the fields from BP