Difference between revisions of "Didon Offshore Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === |
* Operator: Enquest | * Operator: Enquest | ||
* Country: Tunisia | * Country: Tunisia | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The development consists of a WH Platform connected to the vessel Didon FSO | * The development consists of a WH Platform connected to the vessel Didon FSO | ||
| − | + | === Contractors === | |
* **Micoperi:** Phase II | * **Micoperi:** Phase II | ||
** Offshore installation of the production jacket, topside drilling and production platform, inst. & hook up | ** Offshore installation of the production jacket, topside drilling and production platform, inst. & hook up | ||
** Installation of 5”coiled tubing and umbilicals | ** Installation of 5”coiled tubing and umbilicals | ||
| − | + | === History === | |
* 1998 - First oil produced | * 1998 - First oil produced | ||
* 2005 - PA Resources became the major shareholder | * 2005 - PA Resources became the major shareholder | ||
| Line 25: | Line 25: | ||
* 2013 - Enquest acquired a 70% interest in the field | * 2013 - Enquest acquired a 70% interest in the field | ||
| − | + | === Geology === | |
* | * | ||
| − | + | === Links === | |
# [[Micoperi Offshore Pipeline References]] | # [[Micoperi Offshore Pipeline References]] | ||
# [[FoundOcean Subsea References]] | # [[FoundOcean Subsea References]] | ||
Latest revision as of 06:29, 1 July 2024
Summary Information
- Operator: Enquest
- Country: Tunisia
- Location: Zarat Permit, Offshore
- Production start: 1998
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The development consists of a WH Platform connected to the vessel Didon FSO
Contractors
- **Micoperi:** Phase II
- Offshore installation of the production jacket, topside drilling and production platform, inst. & hook up
- Installation of 5”coiled tubing and umbilicals
History
- 1998 - First oil produced
- 2005 - PA Resources became the major shareholder
- 2006 - New platform starts production
- 2007 - Phase II of the Didon development completed
- 2008 - Oil Discovery At Didon North
- 2013 - Enquest acquired a 70% interest in the field
Geology
Links
- Micoperi Offshore Pipeline References
- FoundOcean Subsea References
- Oil And Gas Concessions In Tunisia
- Supplementary Information To The PA Resources Acquisition Of Tunisian Assets
- Closing Of Didon/Zarat
- First Oil From The Platform On The Didon-Field
- PA Resources’ Vessel Didon FSO Is Back In Operation At The Didon Field
- PA Resources Makes Oil Discovery At Didon North
- Enquest Announces Its Entry Into North Africa Through A 70% Operating Interest In The Producing Didon Oil Field And The Zarat Permit In Tunisia