Difference between revisions of "Gryphon FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Gryphon FPSO * Field: Gryphon Oil Field * Country: UK * Ownership: Total * Website: * Field Operated By: Total * Capacity: bpd * Year of Co...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Name: Gryphon FPSO | * Name: Gryphon FPSO | ||
Line 8: | Line 8: | ||
* Field Operated By: Total | * Field Operated By: Total | ||
* Capacity: bpd | * Capacity: bpd | ||
− | * Year of Completion: | + | * Year of Completion: 1993 |
− | + | === Brief Description === | |
− | * The vessel is the longest serving permanently moored | + | * The vessel is the longest serving permanently moored FPSO in Europe |
+ | * The FPSO is 258 metres long, 41 metres wide and 24 metres deep | ||
* It is capable of storing 540,000 barrels of oil | * It is capable of storing 540,000 barrels of oil | ||
+ | * Gas production is constrained by processing capacities at the Gryphon FPSO, currently limited to 47MMScf/d of gas handling (gas export, gas lift and re-injection) via three compression trains. | ||
+ | * The glycol dehydration system has an installed capacity of 90MMScf/d (potential future gas expansion capacity). | ||
+ | * Produced water facilities consists of treatment equipment (design rate of 110,000 bwpd) and reinjection | ||
+ | equipment for reservoir pressure maintenance and disposal (design rate of 79,000bwpd). | ||
+ | * Main power generation for normal operations is provided by two 8.5 MW gas turbine generators, with | ||
+ | further power generation provided by up to five 3MW diesel driven generators, according to operational requirements. All five diesel generators are able to operate in parallel with the gas | ||
+ | turbine generators | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | + | === Contractors === | |
+ | * '''Astano:''' Construction of FPSO hull | ||
+ | * '''McNulty Offshore:''' Construction of topsides | ||
+ | * '''Aker:''' Pusnes Offloading System | ||
+ | * '''ABB:''' Electrical Systems | ||
+ | |||
+ | === Status === | ||
* In operation | * In operation | ||
− | + | === History === | |
* 1993 - Gryphon FPSO constructed | * 1993 - Gryphon FPSO constructed | ||
* 2011 - The vessel was damaged in a storm | * 2011 - The vessel was damaged in a storm | ||
Line 30: | Line 39: | ||
* 2017 - Total acquires Maersk and becomes operator | * 2017 - Total acquires Maersk and becomes operator | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] |
Revision as of 16:36, 30 June 2024
Contents
Summary Information
- Name: Gryphon FPSO
- Field: Gryphon Oil Field
- Country: UK
- Ownership: Total
- Website:
- Field Operated By: Total
- Capacity: bpd
- Year of Completion: 1993
Brief Description
- The vessel is the longest serving permanently moored FPSO in Europe
- The FPSO is 258 metres long, 41 metres wide and 24 metres deep
- It is capable of storing 540,000 barrels of oil
- Gas production is constrained by processing capacities at the Gryphon FPSO, currently limited to 47MMScf/d of gas handling (gas export, gas lift and re-injection) via three compression trains.
- The glycol dehydration system has an installed capacity of 90MMScf/d (potential future gas expansion capacity).
- Produced water facilities consists of treatment equipment (design rate of 110,000 bwpd) and reinjection
equipment for reservoir pressure maintenance and disposal (design rate of 79,000bwpd).
- Main power generation for normal operations is provided by two 8.5 MW gas turbine generators, with
further power generation provided by up to five 3MW diesel driven generators, according to operational requirements. All five diesel generators are able to operate in parallel with the gas turbine generators
Contractors
- Astano: Construction of FPSO hull
- McNulty Offshore: Construction of topsides
- Aker: Pusnes Offloading System
- ABB: Electrical Systems
Status
- In operation
History
- 1993 - Gryphon FPSO constructed
- 2011 - The vessel was damaged in a storm
- 2013 - Production resumes following repairs
- 2017 - Total acquires Maersk and becomes operator
Other Information
- -