* Operator: Centrica | * Operator: Centrica | ||
* Country: UK | * Country: UK | ||
| Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
| − | + | === Description === | |
* The field consists of two unmanned platforms, Audrey A & B | * The field consists of two unmanned platforms, Audrey A & B | ||
* Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel** | * Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel** | ||
| Line 18: | Line 18: | ||
* Gas exported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]]. | * Gas exported via the [[Lincolnshire Offshore Gas Gathering System (Loggs)]]. | ||
| − | + | === Contractors === | |
* **Heerema Marine Contractors:** Audrey platforms | * **Heerema Marine Contractors:** Audrey platforms | ||
* **AMEC:** Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion | * **AMEC:** Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion | ||
| − | + | ==== Ann Gas Field Development ==== | |
* **J P Kenny:** Jack-up installed drilling template, manifold and protection structure | * **J P Kenny:** Jack-up installed drilling template, manifold and protection structure | ||
| − | + | === History === | |
* 1966 - Ann field developed | * 1966 - Ann field developed | ||
* 1987 - Field development approved | * 1987 - Field development approved | ||
| Line 34: | Line 34: | ||
* 1995 - Alison approval granted | * 1995 - Alison approval granted | ||
* 1998 - Centrica acquires a stake from Powergen | * 1998 - Centrica acquires a stake from Powergen | ||
| + | * 2012 - Production ceased at the Ann field | ||
| + | * 2018 - Approval granted for decommissioning | ||
| − | + | === Geology | |
* | * | ||
| − | + | === Links === | |
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
# [[FoundOcean Subsea References]] | # [[FoundOcean Subsea References]] | ||
# [[J P Kenny Subsea References]] | # [[J P Kenny Subsea References]] | ||
# [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | # [http://killajoules.wikidot.com/archive:centrica-strikes-offshore-deal Centrica strikes offshore deal] | ||
# [http://killajoules.wikidot.com/archive:amec-wins-north-sea-engineering-services-contract-fr AMEC Wins North Sea Engineering Services Contract from Venture Production] | # [http://killajoules.wikidot.com/archive:amec-wins-north-sea-engineering-services-contract-fr AMEC Wins North Sea Engineering Services Contract from Venture Production] | ||
Revision as of 15:52, 24 June 2024
Contents
Summary Information
- Operator: Centrica
- Country: UK
- Location: Southern North Sea
- Production start: 1998
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field consists of two unmanned platforms, Audrey A & B
- Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel**
- The Ann field is located in blocks 48/10a and 49/6a, approximately 40km North North-East of the Lincolnshire Offshore Gas Gathering System (LOGGS) complex.
- Ann combines a protected manifold structure with capacity for 3 wells and a remote wellhead
- The Alison field is located in block 49/11a
- The Alison installation is a protected manifold structure with capacity for 3 wells.
- Gas exported via the Lincolnshire Offshore Gas Gathering System (Loggs).
Contractors
- **Heerema Marine Contractors:** Audrey platforms
- **AMEC:** Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion
Ann Gas Field Development
- **J P Kenny:** Jack-up installed drilling template, manifold and protection structure
History
- 1966 - Ann field developed
- 1987 - Field development approved
- 1992 - Approval granted for Ann
- 1994 - Ann field begins production
- 1995 - Alison approval granted
- 1998 - Centrica acquires a stake from Powergen
- 2012 - Production ceased at the Ann field
- 2018 - Approval granted for decommissioning
=== Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil and Gas Production Platforms In The UK
- UK Oil and Gas Field Approved Decommissioning Programmes
- FoundOcean Subsea References
- J P Kenny Subsea References
- Centrica strikes offshore deal
- AMEC Wins North Sea Engineering Services Contract from Venture Production