Difference between revisions of "Jacky Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Ithaca * Country: UK * Location: * Production start: 2009 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ De...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Ithaca
 
* Operator: Ithaca
 
* Country: UK  
 
* Country: UK  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 +
* The field is no longer producing
 
* This field is located in Block 12/21c in the UK Continental Shelf, approximately 12 miles from the Moray Firth coastline and 6 miles from the [[Beatrice Oil Field]].
 
* This field is located in Block 12/21c in the UK Continental Shelf, approximately 12 miles from the Moray Firth coastline and 6 miles from the [[Beatrice Oil Field]].
* Jacky has been developed with a single production well, tied in through a normally unmanned wellhead platform, constructed by HSM Steel Structures BV, then via a subsea pipeline to the Beatrice Alpha production facility.  
+
* The facilities in the Jacky Field comprise the Jacky Wellhead Platform which is a normally unattended installation (NUI) positioned over the well locations with a topsides production tree and production manifold in 40m water depth.
* From there Jacky production is exported, along with Beatrice oil, to the Nigg Oil Terminal in the Cromarty Firth
+
* Production was exported through a platform riser and subsea pipeline to the Beatrice Alpha (AP) platform. The installation also included a water injection well (12/21c - J02) with facilities consisting of a water injection tree and header with injection water provided from Beatrice Alpha (AP) by subsea pipeline.
 +
* From Beatrice, Jacky production is exported, along with Beatrice oil, to the [[Nigg Oil Terminal]] in the Cromarty Firth
  
+++ Contractors
+
=== Contractors ===
* **HSM Offshore:** Wellhead Platform & Jacket
+
* '''HSM Offshore:''' Wellhead Platform & Jacket
* **Subsea 7:** Project management, fabrication, installation and offshore pre-commissioning of a 10.5km production and water injection pipeline and power cable tie-back
+
* '''Subsea 7:''' Project management, fabrication, installation and offshore pre-commissioning of a 10.5km production and water injection pipeline and power cable tie-back
* **KWsubsea:** 8" Pipeline (4.7km, 5.2km, 0.8km) + 8" Water Injection  
+
* '''KWsubsea:''' 8" Pipeline (4.7km, 5.2km, 0.8km) + 8" Water Injection  
  
+++ History
+
=== History ===
 
* 2008 - Project development approved by UK Government
 
* 2008 - Project development approved by UK Government
 
* 2008 - Subsea 7 awarded pipeline contract
 
* 2008 - Subsea 7 awarded pipeline contract
 
* 2009 - First oil production  
 
* 2009 - First oil production  
 +
* 2014 - Production ended
 +
* 2018 - Approval granted for decommissioning
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[HSM Offshore Platform References]]
 
# [[HSM Offshore Platform References]]
 
# [[KWsubsea Upheaval Buckling And Out Of Straightness Analysis]]
 
# [[KWsubsea Upheaval Buckling And Out Of Straightness Analysis]]
 
# [http://killajoules.wikidot.com/archive:subsea-7-announces-first-north-sea-contract-win-from Subsea 7 Announces First North Sea Contract Win from Ithaca Energy]
 
# [http://killajoules.wikidot.com/archive:subsea-7-announces-first-north-sea-contract-win-from Subsea 7 Announces First North Sea Contract Win from Ithaca Energy]
 
# [http://killajoules.wikidot.com/archive:first-oil-from-the-jacky-field-and-resumption-of-pro First Oil from the Jacky Field and Resumption of Production from Beatrice Bravo Facility]
 
# [http://killajoules.wikidot.com/archive:first-oil-from-the-jacky-field-and-resumption-of-pro First Oil from the Jacky Field and Resumption of Production from Beatrice Bravo Facility]

Revision as of 15:41, 24 June 2024

Summary Information

  • Operator: Ithaca
  • Country: UK
  • Location:
  • Production start: 2009
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The field is no longer producing
  • This field is located in Block 12/21c in the UK Continental Shelf, approximately 12 miles from the Moray Firth coastline and 6 miles from the Beatrice Oil Field.
  • The facilities in the Jacky Field comprise the Jacky Wellhead Platform which is a normally unattended installation (NUI) positioned over the well locations with a topsides production tree and production manifold in 40m water depth.
  • Production was exported through a platform riser and subsea pipeline to the Beatrice Alpha (AP) platform. The installation also included a water injection well (12/21c - J02) with facilities consisting of a water injection tree and header with injection water provided from Beatrice Alpha (AP) by subsea pipeline.
  • From Beatrice, Jacky production is exported, along with Beatrice oil, to the Nigg Oil Terminal in the Cromarty Firth

Contractors

  • HSM Offshore: Wellhead Platform & Jacket
  • Subsea 7: Project management, fabrication, installation and offshore pre-commissioning of a 10.5km production and water injection pipeline and power cable tie-back
  • KWsubsea: 8" Pipeline (4.7km, 5.2km, 0.8km) + 8" Water Injection

History

  • 2008 - Project development approved by UK Government
  • 2008 - Subsea 7 awarded pipeline contract
  • 2009 - First oil production
  • 2014 - Production ended
  • 2018 - Approval granted for decommissioning

Geology

Links

  1. HSM Offshore Platform References
  2. KWsubsea Upheaval Buckling And Out Of Straightness Analysis
  3. Subsea 7 Announces First North Sea Contract Win from Ithaca Energy
  4. First Oil from the Jacky Field and Resumption of Production from Beatrice Bravo Facility