Difference between revisions of "North Idku Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: RWE * Country: Egypt * Location: Nile Delta * Production start: * Partners: MOL * Type: Gas * Estimated Reserves: * Production Volume: +++...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
* Operator: RWE
+
* Operator: Energean
 
* Country: Egypt
 
* Country: Egypt
 
* Location: Nile Delta
 
* Location: Nile Delta
* Production start:  
+
* Production start: 2023
* Partners: MOL
+
* Partners:  
 
* Type: Gas
 
* Type: Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
* The gas produced is piped to and processed by onshore processing facilities
+
* The North El Amirya and North Idku fields were developed together, as satellite fields to the [[Abu Qir Gas Fields | Abu Qir gas-condensate offshore and onshore infrastructure]].
 +
* Multiple wells were completed and tied back to the North Abu Qir III platform.
 +
* NEA contains two discovered and appraised gas fields (Yazzi and Python). NI – which is split into northern 21 and southern areas – contains four discovered gas fields, one of which is readied for development.
 +
* Both areas contain additional mapped but undrilled prospects.
  
+++ Contractors
+
=== Contractors ===
* **ENPPI:** Engineering services for the platform structure and topside facilities
+
* '''ENPPI:''' Engineering services for the platform structure and topside facilities
* **KWSubsea:**
+
* '''KWSubsea:'''
* FEED of 10" x 7km infield and 16" x 33km export pipelines and tie-in spools including shore approach design
+
** FEED of 10" x 7km infield and 16" x 33km export pipelines and tie-in spools including shore approach design
* Detailed analysis of lateral buckling and trawling response of exposed 16" gas export and 10" infield flowlines
+
** Detailed analysis of lateral buckling and trawling response of exposed 16" gas export and 10" infield flowlines
  
+++ History
+
=== History ===
 
* 1999 - North Idku Gas Field discovered
 
* 1999 - North Idku Gas Field discovered
 
* 2008 - RWE announces field development
 
* 2008 - RWE announces field development
 +
* 2019 - Energean acquired a stake in the field from Edison
 +
* 2023 - First gas produced
 +
* 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
# [[Enppi Offshore Platform References]]
+
# [[ENPPI Offshore Platform References]]
 
# [http://killajoules.wikidot.com/archive:mol-achieves-success-in-egypt-finding-natural-gas-re MOL achieves success in Egypt finding natural gas reserves]
 
# [http://killajoules.wikidot.com/archive:mol-achieves-success-in-egypt-finding-natural-gas-re MOL achieves success in Egypt finding natural gas reserves]
 
# [http://killajoules.wikidot.com/archive:rwe-dea-starts-offshore-gas-field-development-in-nor RWE Dea starts offshore gas field development in North Idku]
 
# [http://killajoules.wikidot.com/archive:rwe-dea-starts-offshore-gas-field-development-in-nor RWE Dea starts offshore gas field development in North Idku]
 +
# [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.]
 +
# [https://a-barrel-full.blogspot.com/2024/06/strategic-sale-of-egypt-italy-and.html Strategic sale of Egypt, Italy and Croatia portfolio]
 +
 +
 +
[[category:Field]]
 +
[[category:Egypt]]
 +
[[category:Energean]]

Latest revision as of 15:32, 23 June 2024

Summary Information

  • Operator: Energean
  • Country: Egypt
  • Location: Nile Delta
  • Production start: 2023
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The North El Amirya and North Idku fields were developed together, as satellite fields to the Abu Qir gas-condensate offshore and onshore infrastructure.
  • Multiple wells were completed and tied back to the North Abu Qir III platform.
  • NEA contains two discovered and appraised gas fields (Yazzi and Python). NI – which is split into northern 21 and southern areas – contains four discovered gas fields, one of which is readied for development.
  • Both areas contain additional mapped but undrilled prospects.

Contractors

  • ENPPI: Engineering services for the platform structure and topside facilities
  • KWSubsea:
    • FEED of 10" x 7km infield and 16" x 33km export pipelines and tie-in spools including shore approach design
    • Detailed analysis of lateral buckling and trawling response of exposed 16" gas export and 10" infield flowlines

History

  • 1999 - North Idku Gas Field discovered
  • 2008 - RWE announces field development
  • 2019 - Energean acquired a stake in the field from Edison
  • 2023 - First gas produced
  • 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake

Geology

Links

  1. ENPPI Offshore Platform References
  2. MOL achieves success in Egypt finding natural gas reserves
  3. RWE Dea starts offshore gas field development in North Idku
  4. Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.
  5. Strategic sale of Egypt, Italy and Croatia portfolio