** In the centre of the complex is the Central Production Platform (CPP).  
 
** In the centre of the complex is the Central Production Platform (CPP).  
 
** The import pipelines from the four satellite platforms terminate here, and the gas/condensate export pipeline begins at the CPP
 
** The import pipelines from the four satellite platforms terminate here, and the gas/condensate export pipeline begins at the CPP
** Located at the western end of the complex, AP1 is the accommodation platform
+
** Located at the western end of the complex, AP1 is the accommodation platform
 
** At the eastern end of the complex, DP1 is the Drilling platform.  
 
** At the eastern end of the complex, DP1 is the Drilling platform.  
 
** In addition, production units DP3, DP4, DP6 and DP8 are also connected
 
** In addition, production units DP3, DP4, DP6 and DP8 are also connected
 
** It has risers from eight wells, plus a flexible import riser and control umbilical to Bains
 
** It has risers from eight wells, plus a flexible import riser and control umbilical to Bains
 +
** The Bains gas field was developed as a single well subsea tie-back
 
* Gas is exported to the [[Rampside Gas Terminal]]
 
* Gas is exported to the [[Rampside Gas Terminal]]
 
* The '''North Morecambe gas field''' consists of a single normally unmanned small steel platform
 
* The '''North Morecambe gas field''' consists of a single normally unmanned small steel platform
Line 46: Line 47:
 
* 2013 - First gas from Rhyl
 
* 2013 - First gas from Rhyl
 
* 2017 - Spirit energy becomes the operator
 
* 2017 - Spirit energy becomes the operator
 
+
* 2019 - Approval granted for decommissioning of Bains
 +
* 2021 - DP3 and DP4 platforms were removed
 +
 
=== Geology ===
 
=== Geology ===
 
*  
 
*  
Line 53: Line 56:
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [[FoundOcean Subsea References]]
 
# [[FoundOcean Subsea References]]
 
# [[International Protective Coatings Platform References]]
 
# [[International Protective Coatings Platform References]]
Line 58: Line 62:
 
# [http://killajoules.wikidot.com/blog:4083 Centrica Energy delivers first production from Rhyl gas field]
 
# [http://killajoules.wikidot.com/blog:4083 Centrica Energy delivers first production from Rhyl gas field]
 
# [https://abarrelfull.blogspot.com/2023/08/spirit-energy-launched-following.html Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture]
 
# [https://abarrelfull.blogspot.com/2023/08/spirit-energy-launched-following.html Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture]
 +
# [https://abarrelfull.blogspot.com/2023/11/disused-gas-platforms-to-be-removed-by.html Disused Gas Platforms To Be Removed By World’s Largest Vessel]
  
  

Latest revision as of 16:34, 20 June 2024

Summary Information

  • Operator: Spirit Energy
  • Country: UK
  • Location: East Irish Sea
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Morecambe Hub comprises three fields in the East Irish Sea - North Morecambe, South Morecambe and Rhyl. The fields lie approximately 25km south west of Walney Island, across blocks 110/2a, 110/3a, 110/8a and 113/27b, in water depths that range from 17 to 35m.
  • The South Morecambe gas field is one of the UK’s largest fields
  • The **Central Processing Complex** is a three-platform, bridge-linked complex with a flare boom tower
    • In the centre of the complex is the Central Production Platform (CPP).
    • The import pipelines from the four satellite platforms terminate here, and the gas/condensate export pipeline begins at the CPP
    • Located at the western end of the complex, AP1 is the accommodation platform
    • At the eastern end of the complex, DP1 is the Drilling platform.
    • In addition, production units DP3, DP4, DP6 and DP8 are also connected
    • It has risers from eight wells, plus a flexible import riser and control umbilical to Bains
    • The Bains gas field was developed as a single well subsea tie-back
  • Gas is exported to the Rampside Gas Terminal
  • The North Morecambe gas field consists of a single normally unmanned small steel platform
  • The Rivers, Millom and Dalton Gas Fields, operated by ConocoPhillips, are tied back to the normally-unmanned North Morecambe platform.
  • Gas from the Rhyl Gas Field is also transported via the North Morecambe platform

Contractors

  • South Morecombe
  • **Haverton Hill:** Construction of Morecambe platform modules
  • **Heerema Marine Contractors:** Installation of CPP, DP3, DP4, DP6 & DP8
  • **FoundOcean:** Grouting for CPP, DP1, DP3, DP4, DP6, DP8, AP1 and Flare Tower
  • North Morecombe
  • **Heerema Marine Contractors:** North Morecambe platform
  • **McDermott-ETPM:** Subsea installations
  • **Subsea 7:** DPPA Platform
  • **FoundOcean:** Grouting for DPPA Platform

History

  • 1974 - South Morecambe Gas Field discovered
  • 1976 - North Morecambe Gas Field discovered
  • 1982 - Government approval granted for South Morecambe
  • 1985 - First gas produced from South Morecambe
  • 1989 - DP6 and DP8 platforms installed
  • 1992 - Government approval granted for North Morecombe
  • 1994 - First gas produced from North Morecombe
  • 2009 - The Rhyl field was first discovered
  • 2013 - First gas from Rhyl
  • 2017 - Spirit energy becomes the operator
  • 2019 - Approval granted for decommissioning of Bains
  • 2021 - DP3 and DP4 platforms were removed

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil and Gas Production Platforms In The UK
  3. UK Oil and Gas Field Approved Decommissioning Programmes
  4. FoundOcean Subsea References
  5. International Protective Coatings Platform References
  6. Serimax Pipeline References
  7. Centrica Energy delivers first production from Rhyl gas field
  8. Spirit Energy launched following completion of Centrica and Bayerngas Norge E&P joint venture
  9. Disused Gas Platforms To Be Removed By World’s Largest Vessel