Difference between revisions of "Tambar Oil and Gas Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: BP * Country: Norway * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ Descri...")
 
Line 1: Line 1:
 
Summary Information
 
Summary Information
* Operator: BP  
+
* Operator: Aker BP  
 
* Country: Norway
 
* Country: Norway
* Location:  
+
* Location: Southern part of the North Sea
* Production start:  
+
* Production start: 2001
* Partners:  
+
* Partners: Aker BP (55%)/ DNO (45%)
 
* Type: Oil / Gas
 
* Type: Oil / Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
Line 22: Line 22:
 
* 1983 - Tambar Oil And Gas Field discovered
 
* 1983 - Tambar Oil And Gas Field discovered
 
* 2001 - The Tambar oil field started producing
 
* 2001 - The Tambar oil field started producing
 +
* 2019 - DNO acquired Faroe and became a partner
  
 
+++ Geology
 
+++ Geology
Line 30: Line 31:
 
# [http://killajoules.wikidot.com/archive:bp-norge-as-bp-has-received-consent-to-carry-out-maj BP Norge AS (BP) has received consent to carry out major modifications on the Tambar field.]
 
# [http://killajoules.wikidot.com/archive:bp-norge-as-bp-has-received-consent-to-carry-out-maj BP Norge AS (BP) has received consent to carry out major modifications on the Tambar field.]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-by-bp-norge-for-tambar-prod Technip awarded contract by BP Norge for Tambar production pipeline Phase 2]
 
# [http://killajoules.wikidot.com/archive:technip-awarded-contract-by-bp-norge-for-tambar-prod Technip awarded contract by BP Norge for Tambar production pipeline Phase 2]
 +
# [https://abarrelfull.blogspot.com/2024/06/dno-to-make-cash-offer-for-all-shares.html DNO to make cash offer for all shares of Faroe Petroleum plc]
 +
 +
 +
[[category:Field]]
 +
[[category:Norway]]
 +
[[category:Aker BP]]

Revision as of 14:10, 17 June 2024

Summary Information

  • Operator: Aker BP
  • Country: Norway
  • Location: Southern part of the North Sea
  • Production start: 2001
  • Partners: Aker BP (55%)/ DNO (45%)
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Tambar is an oil field located southeast of the Ula field in the southern part of the North Sea. The water depth in the area is 68 metres.
  • Its simple development solution consists of a normally unmanned wellhead facility with remote control from and processing on Ula
  • The oil is transported to Ula through a pipeline
  • From there it is transported on the Norpipe Crude Oil Pipeline to Teesside via Ekofisk
  • Gas is injected in the Ula reservoir to improve oil recovery

+++ Contractors

  • **Technip:** Engineering, fabrication, installation and pre-commissioning of the flowline, tie-ins and sub sea equipment protection work

+++ History

  • 1983 - Tambar Oil And Gas Field discovered
  • 2001 - The Tambar oil field started producing
  • 2019 - DNO acquired Faroe and became a partner

+++ Geology

  • The reservoir consists of Upper Jurassic sandstones of the Ula Formation, deposited in a shallow marine environment. The reservoir lies at a depth of 4 100 - 4 200 metres and the reservoir characteristics are generally very good.

+++ Links

  1. NPD, Tambar
  2. BP Norge AS (BP) has received consent to carry out major modifications on the Tambar field.
  3. Technip awarded contract by BP Norge for Tambar production pipeline Phase 2
  4. DNO to make cash offer for all shares of Faroe Petroleum plc