Difference between revisions of "Pickerill Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 13: | Line 13: | ||
* The Pickerill gas field is located in the United Kingdom Continental Shelf (UKCS) Block 48/11 in the Southern North Sea, 65km offshore from the Theddlethorpe Gas Terminal (TGT). It was discovered by well 48/11b-4, drilled by Conoco (UK) Limited in 1984, and gas development commenced in 1992. | * The Pickerill gas field is located in the United Kingdom Continental Shelf (UKCS) Block 48/11 in the Southern North Sea, 65km offshore from the Theddlethorpe Gas Terminal (TGT). It was discovered by well 48/11b-4, drilled by Conoco (UK) Limited in 1984, and gas development commenced in 1992. | ||
* The Pickerill Field comprises of two normally unmanned installations (NUI); Pickerill B (44/11A) and Pickerill A (48/11B) with a maximum personnel on board (POB) of 12. | * The Pickerill Field comprises of two normally unmanned installations (NUI); Pickerill B (44/11A) and Pickerill A (48/11B) with a maximum personnel on board (POB) of 12. | ||
| − | * The [[Juliet Gas Field | Juliet subsea development]] is located in Block 47/14B to the west of the Pickerill Field and comprises of two subsea (free flowing) | + | * The [[Juliet Gas Field | Juliet subsea development]] is located in Block 47/14B to the west of the Pickerill Field and comprises of two subsea (free flowing) wells tied into a subsea manifold, which is then connected to Pickerill A via a 12” pipeline (PL3121), 22km in length. Juliet gas was co-mingled with Pickerill gas at Pickerill A and then exported to [[Theddlethorpe Gas Processing Plant]]. |
| − | wells tied into a subsea manifold, which is then connected to Pickerill A via a 12” pipeline (PL3121), 22km in length. Juliet gas was co-mingled with Pickerill gas at | ||
| − | Pickerill A and then exported to [[Theddlethorpe Gas Processing Plant]]. | ||
| Line 36: | Line 34: | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
# [[Saipem Europe Pipeline References]] | # [[Saipem Europe Pipeline References]] | ||
# [http://killajoules.wikidot.com/archive:bp-to-sell-southern-north-sea-gas-package-to-perenco BP To Sell Southern North Sea Gas Package To Perenco] | # [http://killajoules.wikidot.com/archive:bp-to-sell-southern-north-sea-gas-package-to-perenco BP To Sell Southern North Sea Gas Package To Perenco] | ||
# [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea] | # [http://killajoules.wikidot.com/blog:5083 GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Perenco]] | ||
| + | [[category:Decommissioned]] | ||
Latest revision as of 14:28, 15 June 2024
Summary Information
- Operator: Perenco
- Country: UK
- Location: North Sea
- Production start: 1992
- Partners: Marubeni
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is no longer in production
- The Pickerill gas field is located in the United Kingdom Continental Shelf (UKCS) Block 48/11 in the Southern North Sea, 65km offshore from the Theddlethorpe Gas Terminal (TGT). It was discovered by well 48/11b-4, drilled by Conoco (UK) Limited in 1984, and gas development commenced in 1992.
- The Pickerill Field comprises of two normally unmanned installations (NUI); Pickerill B (44/11A) and Pickerill A (48/11B) with a maximum personnel on board (POB) of 12.
- The Juliet subsea development is located in Block 47/14B to the west of the Pickerill Field and comprises of two subsea (free flowing) wells tied into a subsea manifold, which is then connected to Pickerill A via a 12” pipeline (PL3121), 22km in length. Juliet gas was co-mingled with Pickerill gas at Pickerill A and then exported to Theddlethorpe Gas Processing Plant.
Contractors
- Saipem: Pipeline - T&I
History
- 1984 - Pickerill Gas Field discovered
- 1990 - Field development approved by UK government
- 1992 - First gas produced
- 2003 - Perenco acquires the field from BP
- 2014 - Juliet Gas Field comes onstream
- 2018 - Production ceased
- 2019 - Approval granted for decommissioning
Geology
Links
- UK Oil and Gas Fields by Approval Date
- List Of Oil and Gas Production Platforms In The UK
- UK Oil and Gas Field Approved Decommissioning Programmes
- Saipem Europe Pipeline References
- BP To Sell Southern North Sea Gas Package To Perenco
- GDF SUEZ E&P raises its hydrocarbon production with multiple start ups in the North Sea