| Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Shell * Country: UK * Location: Central North Sea * Production start: 2004 * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:...") | Abarrelfull (talk | contribs)  | ||
| (One intermediate revision by the same user not shown) | |||
| Line 1: | Line 1: | ||
| − | Summary Information | + | === Summary Information === | 
| * Operator: Shell | * Operator: Shell | ||
| * Country: UK | * Country: UK | ||
| Line 9: | Line 9: | ||
| * Production Volume:   | * Production Volume:   | ||
| − | + | === Description === | |
| + | * The field is no longer operational | ||
| * Goldeneye was the first development to bring gas ashore from the Outer Moray Firth area | * Goldeneye was the first development to bring gas ashore from the Outer Moray Firth area | ||
| − | *  | + | * The Goldeneye field was a normal temperature, normal pressure gas condensate field located in blocks 14/28b, 14/29a, 20/3b and 20/4b of the United Kingdom Continental Shelf (UKCS) in the central North Sea, approximately 100km North-East of St. Fergus.  | 
| − | *  | + | * The NUI is a 4-leg steel jacket substructure supporting an integrated topsides deck structure.  | 
| − | * The  | + | * There are 5 platform wells for the Goldeneye Platform, though provision had been made for up to 8. | 
| − | *  | + | * The full well stream was transferred to the dedicated Goldeneye onshore facility co-located at the Shell [[St Fergus Gas Processing Plants | St. Fergus gas terminal]]. | 
| + | * The [[Atlantic and Cromarty Gas and Condensate Fields]] were controlled via the Goldeneye platform by means of an umbilical and associated equipment | ||
| + | * The facilities were to be used for the Peterhead CCS (Carbon Capture and Storage) project, but that has been cancelled | ||
| + | === Contractors === | ||
| + | * '''Kvaerner:''' Jacket and Piles | ||
| + | * '''Saipem:''' Subsea Pipelines - EPIC | ||
| − | + | === History === | |
| − | |||
| − | |||
| − | |||
| − | |||
| * 2002 - Project development approved by UK Government   | * 2002 - Project development approved by UK Government   | ||
| Line 28: | Line 30: | ||
| * 2005 - Talisman acquires Paladin, getting a stake the field | * 2005 - Talisman acquires Paladin, getting a stake the field | ||
| * 2006 - Endeavour acquires a 7.5% stake from Talisman | * 2006 - Endeavour acquires a 7.5% stake from Talisman | ||
| − | * 2011 - Petrofac signed an agreement with Shell for the re-development of the Goldeneye gas field  | + | * 2011 - Petrofac signed an agreement with Shell for the re-development of the Goldeneye gas field as a potential CO2 storage facility. | 
| + | * 2019 - Approval granted for decommissioning | ||
| − | + | === Geology === | |
| − | |||
| *   | *   | ||
| − | + | === Links === | |
| # [[List Of Oil Production Platforms In The UK]] | # [[List Of Oil Production Platforms In The UK]] | ||
| # [[List Of Oil and Gas Production Platforms In The UK]] | # [[List Of Oil and Gas Production Platforms In The UK]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
| # [[Kvaerner Platform References]] | # [[Kvaerner Platform References]] | ||
| # [[Saipem Europe Pipeline References]] | # [[Saipem Europe Pipeline References]] | ||
| Line 44: | Line 47: | ||
| # [http://killajoules.wikidot.com/archive:talisman-energy-rationalizes-north-sea-assets Talisman Energy Rationalizes North Sea Assets] | # [http://killajoules.wikidot.com/archive:talisman-energy-rationalizes-north-sea-assets Talisman Energy Rationalizes North Sea Assets] | ||
| # [http://killajoules.wikidot.com/blog:31 Petrofac and Shell Agree Partnership for North Sea CCS Project] | # [http://killajoules.wikidot.com/blog:31 Petrofac and Shell Agree Partnership for North Sea CCS Project] | ||
| + | |||
| + | [[category:Field]] | ||
| + | [[category:UK]] | ||
| + | [[category:Shell]] | ||
| + | [[category:Decommissioned]] | ||
Latest revision as of 14:16, 15 June 2024
Summary Information
- Operator: Shell
- Country: UK
- Location: Central North Sea
- Production start: 2004
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is no longer operational
- Goldeneye was the first development to bring gas ashore from the Outer Moray Firth area
- The Goldeneye field was a normal temperature, normal pressure gas condensate field located in blocks 14/28b, 14/29a, 20/3b and 20/4b of the United Kingdom Continental Shelf (UKCS) in the central North Sea, approximately 100km North-East of St. Fergus.
- The NUI is a 4-leg steel jacket substructure supporting an integrated topsides deck structure.
- There are 5 platform wells for the Goldeneye Platform, though provision had been made for up to 8.
- The full well stream was transferred to the dedicated Goldeneye onshore facility co-located at the Shell St. Fergus gas terminal.
- The Atlantic and Cromarty Gas and Condensate Fields were controlled via the Goldeneye platform by means of an umbilical and associated equipment
- The facilities were to be used for the Peterhead CCS (Carbon Capture and Storage) project, but that has been cancelled
Contractors
- Kvaerner: Jacket and Piles
- Saipem: Subsea Pipelines - EPIC
History
- 2002 - Project development approved by UK Government
- 2002 - Centrica acquired Eni's interest in the field
- 2004 - First Gas Produced
- 2005 - Talisman acquires Paladin, getting a stake the field
- 2006 - Endeavour acquires a 7.5% stake from Talisman
- 2011 - Petrofac signed an agreement with Shell for the re-development of the Goldeneye gas field as a potential CO2 storage facility.
- 2019 - Approval granted for decommissioning
Geology
Links
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- UK Oil and Gas Field Approved Decommissioning Programmes
- Kvaerner Platform References
- Saipem Europe Pipeline References
- Eni increases its interest in the Liverpool Bay fields and disposes of other non core North Sea assets
- Talisman to Acquire Paladin Resources Plc for Pounds Sterling 1,218 Million 'C$2,521 Million'
- Royal launch for Goldeneye
- Talisman Energy Rationalizes North Sea Assets
- Petrofac and Shell Agree Partnership for North Sea CCS Project