Difference between revisions of "Braemar Oil Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
| Abarrelfull (talk | contribs) | Abarrelfull (talk | contribs)  | ||
| Line 1: | Line 1: | ||
| === Summary Information === | === Summary Information === | ||
| − | * Operator:  | + | * Operator: RockRose | 
| * Country: UK | * Country: UK | ||
| * Location: Blocks 16/3b and 16/3c | * Location: Blocks 16/3b and 16/3c | ||
| Line 25: | Line 25: | ||
| * 2002 - Project development approved by UK Government | * 2002 - Project development approved by UK Government | ||
| * 2012 - BP sells the field to Taqa | * 2012 - BP sells the field to Taqa | ||
| + | * 2019 - RockRose Energy acquired Marathon's stake | ||
| * 2020 - Approval granted for decommissioning | * 2020 - Approval granted for decommissioning | ||
| Line 36: | Line 37: | ||
| # [http://killajoules.wikidot.com/archive:braemar-field-development-plan-receives-dti-approval Braemar Field Development Plan Receives DTI Approval] | # [http://killajoules.wikidot.com/archive:braemar-field-development-plan-receives-dti-approval Braemar Field Development Plan Receives DTI Approval] | ||
| # [http://killajoules.wikidot.com/blog:3453 BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion] | # [http://killajoules.wikidot.com/blog:3453 BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion] | ||
| + | # [https://abarrelfull.blogspot.com/2023/09/marathon-oil-closes-on-sale-of-uk.html Marathon Oil Closes on Sale of U.K. Business] | ||
| [[category:Field]] | [[category:Field]] | ||
Latest revision as of 06:38, 12 June 2024
Summary Information
- Operator: RockRose
- Country: UK
- Location: Blocks 16/3b and 16/3c
- Production start: 2003
- Partners: Taqa
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is no longer producing
- Braemar is a gas and condensate reservoir located in UK Continental Shelf Block 16/3c in the Central North Sea some 315 kilometres northeast of Aberdeen in a water depth of approximately 125 meters.
- Gas and condensate is produced from a single subsea wellhead and transported in an insulated pipe-in-pipe flowline to the Marathon-operated East Brae platform 12 kilometers away where the gas and liquids are processed.
- Liquids are delivered from East Brae to the Forties Pipeline System for transportation ashore.
- Gas is transported via the Scottish Area Gas Evacuation (SAGE) Pipeline to the SAGE St Fergus Gas Processing Terminal
Contractors
- -
History
- 1985 - Braemar Oil Field discovered
- 2002 - BP increases its stake
- 2003 - Production starts
- 2002 - Project development approved by UK Government
- 2012 - BP sells the field to Taqa
- 2019 - RockRose Energy acquired Marathon's stake
- 2020 - Approval granted for decommissioning
Geology
Links
- UK Oil and Gas Fields by Approval Date
- UK Oil and Gas Field Approved Decommissioning Programmes
- BP and BG agree North Sea asset swap
- Braemar Field Development Plan Receives DTI Approval
- BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion
- Marathon Oil Closes on Sale of U.K. Business
