Difference between revisions of "Ambassador NGL Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 7: Line 7:
 
* Length:  kilometres (225 miles)  
 
* Length:  kilometres (225 miles)  
 
* Capacity:  barrels of oil per day  
 
* Capacity:  barrels of oil per day  
* Crude Type:
+
* Crude Type: Propane
  
 
=== Brief Description ===
 
=== Brief Description ===
Line 31: Line 31:
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
[[category:Country]]
+
[[category:USA]]
[[category:Company]]
+
[[category:NGL Energy Partners]]

Revision as of 17:19, 9 June 2024

Summary Information

  • Source:
  • Destination:
  • Ownership: NGL Energy Partners
  • Website: www.nglenergypartners.com
  • Length: kilometres (225 miles)
  • Capacity: barrels of oil per day
  • Crude Type: Propane

Brief Description

  • The Ambassador Pipeline connects central, northern, and western Michigan propane customers to millions of gallons of underground storage capacity in Eastern Michigan. NGL’s Wheeler Terminal is strategically located at the mid-point of the Pipeline and includes on-site storage of 480,000 gallons of propane. The Kalkaska terminal is located at the northern end of the pipeline and has total storage of 420,000 gallons.

Pipeline Status

  • In operation

History

  • 2021 - Phase 1 of the reversal completed
  • 2022 - Pipeline enters operation
  • 2023 - Phase 2 is completed

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2021-2025
  2. https://abarrelfull.blogspot.com/2024/06/ngl-energy-partners-lp-announces.html NGL Energy Partners LP Announces the Ambassador Pipeline Placed in Service]