Difference between revisions of "Brae Complex Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
Line 21: Line 21:
  
 
=== Contractors ===
 
=== Contractors ===
* **McDermott:** Construction of Brae Alpha & Brae Bravo Platforms
+
* '''McDermott:''' Construction of Brae Alpha & Brae Bravo Platforms
* **RGC:** Construction of Brae East Platform
+
* '''RGC:''' Construction of Brae East Platform
* **Dragados/Lewis Offshore:** Construction of Brae A Modules & Jacket
+
* '''Dragados/Lewis Offshore:''' Construction of Brae A Modules & Jacket
* **BiFab:**
+
* '''BiFab:'''
 
** East Brae - Caisson Risers, Anchor and Clamps. 200 Tonnes. 140m long x 914mm diameter
 
** East Brae - Caisson Risers, Anchor and Clamps. 200 Tonnes. 140m long x 914mm diameter
 
** Brae - Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover
 
** Brae - Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover
* **Emtunga:** Brae A - Heli reception modules
+
* '''Emtunga:''' Brae A - Heli reception modules
* **Penspen:** FEED for East Brae tie-back  
+
* '''Penspen:''' FEED for East Brae tie-back  
* **FoundOcean:** Grouting for:
+
* '''FoundOcean:''' Grouting for:
 
** East Brae spoolpiece supports
 
** East Brae spoolpiece supports
 
** Central Brae Pipeline Crossings
 
** Central Brae Pipeline Crossings
Line 35: Line 35:
 
** Brae A  
 
** Brae A  
  
+++ History
+
=== History ===
  
 
* 1980 - North and South Brae Projects development approved by UK Government
 
* 1980 - North and South Brae Projects development approved by UK Government
Line 49: Line 49:
 
* 2019 - RockRose Energy acquired Marathon's stake
 
* 2019 - RockRose Energy acquired Marathon's stake
  
+++ Geology
+
=== Geology ===
 
*
 
*
  
Line 55: Line 55:
 
# [http://www.marathonoil.com/content/documents/exploration_production/uk_icop/Marathon_Oil_UK_Environmental_Report_2012.pdf Marathon Oil - 2012 - Environmental Performance Report]
 
# [http://www.marathonoil.com/content/documents/exploration_production/uk_icop/Marathon_Oil_UK_Environmental_Report_2012.pdf Marathon Oil - 2012 - Environmental Performance Report]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 
# [[List Of Oil and Gas Production Platforms In The UK]]
 +
# [[UK Oil and Gas Field Approved Decommissioning Programmes]]
 
# [[International Protective Coatings Platform References]]
 
# [[International Protective Coatings Platform References]]
 
# [[BiFab Subsea References]]
 
# [[BiFab Subsea References]]
Line 67: Line 68:
 
# [http://killajoules.wikidot.com/blog:3453 BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion]
 
# [http://killajoules.wikidot.com/blog:3453 BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion]
 
# [https://abarrelfull.blogspot.com/2023/09/marathon-oil-closes-on-sale-of-uk.html Marathon Oil Closes on Sale of U.K. Business]
 
# [https://abarrelfull.blogspot.com/2023/09/marathon-oil-closes-on-sale-of-uk.html Marathon Oil Closes on Sale of U.K. Business]
 +
 +
[[category:Field]]
 +
[[category:UK]]
 +
[[category:Taqa]]

Revision as of 07:17, 3 June 2024

Summary Information

  • Operator: Marathon
  • Country: UK
  • Location: 220 km from the UK coast
  • Production start: 1983
  • Partners: Taqa, Spirit Energy
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • McDermott: Construction of Brae Alpha & Brae Bravo Platforms
  • RGC: Construction of Brae East Platform
  • Dragados/Lewis Offshore: Construction of Brae A Modules & Jacket
  • BiFab:
    • East Brae - Caisson Risers, Anchor and Clamps. 200 Tonnes. 140m long x 914mm diameter
    • Brae - Pipeline Crossover, Protection Cover and Pipe Spools, Subsea Isolation Valve with Protection Cover
  • Emtunga: Brae A - Heli reception modules
  • Penspen: FEED for East Brae tie-back
  • FoundOcean: Grouting for:
    • East Brae spoolpiece supports
    • Central Brae Pipeline Crossings
    • Brae B and Flare Tower
    • Brae A

History

  • 1980 - North and South Brae Projects development approved by UK Government
  • 1983 - Production starts from Brae Alpha
  • 1988 - Production starts from Brae Bravo
  • 1990 - East Brae Project development approved by UK Government
  • 1993 - Production starts from East Brae
  • 1996 - West Brae Project development approved by UK Government
  • 2002 - BP acquires 6.2% of East Brae and 7.7% of Brae South, Central, North from BG Group
  • 2005 - Centrica acquires Kerr McGee assets
  • 2012 - BP sells its stake in the fields to Taqa
  • 2018 - Brae Bravo Ceased Production
  • 2019 - RockRose Energy acquired Marathon's stake

Geology

Links

  1. Marathon Oil - 2012 - Environmental Performance Report
  2. List Of Oil and Gas Production Platforms In The UK
  3. UK Oil and Gas Field Approved Decommissioning Programmes
  4. International Protective Coatings Platform References
  5. BiFab Subsea References
  6. Penspen Offshore And Platform References
  7. UK Oil and Gas Fields by Approval Date
  8. List Of Oil Production Platforms In The UK
  9. FoundOcean Subsea References
  10. Emtunga Offshore Platform References
  11. Serimax Pipeline References
  12. BP and BG agree North Sea asset swap
  13. Centrica to acquire interests in North Sea gas fields
  14. BP to Sell Package of Central North Sea Assets to Taqa for $1.1 Billion
  15. Marathon Oil Closes on Sale of U.K. Business