* The Alma/Galia fields are located in blocks 30/24c and 30/25c respectively, 310km southeast of Aberdeen, in the Central North Sea. | * The Alma/Galia fields are located in blocks 30/24c and 30/25c respectively, 310km southeast of Aberdeen, in the Central North Sea. | ||
* The development is consisted of 7 production wells and 2 water injection/disposal wells | * The development is consisted of 7 production wells and 2 water injection/disposal wells | ||
| − | * Production is via the EnQuest Producer Floating Production, Storage and Offloading vessel [[ | + | * Production is via the EnQuest Producer Floating Production, Storage and Offloading vessel [[EnQuest Producer FPSO]] |
* The field were previously called Duncan and Argyll Oil Fields, which were closed down due to a high water cut. Improvements in technology enabled the redevelopment of the fields. | * The field were previously called Duncan and Argyll Oil Fields, which were closed down due to a high water cut. Improvements in technology enabled the redevelopment of the fields. | ||
| Line 35: | Line 35: | ||
* 2015 - First oil produced | * 2015 - First oil produced | ||
* 2020 - The fields ended production | * 2020 - The fields ended production | ||
| + | * 2020 - Decommissioning approved | ||
=== Geology === | === Geology === | ||
| Line 41: | Line 42: | ||
=== Links === | === Links === | ||
# [[UK Oil and Gas Fields by Approval Date]] | # [[UK Oil and Gas Fields by Approval Date]] | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] | ||
# [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea] | # [http://killajoules.wikidot.com/blog:2690 Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea] | ||
# [https://abarrelfull.blogspot.com/2024/05/enquest-to-farm-out-approximately-300m.html EnQuest to farm out approximately £300m of the Alma/Galia development] | # [https://abarrelfull.blogspot.com/2024/05/enquest-to-farm-out-approximately-300m.html EnQuest to farm out approximately £300m of the Alma/Galia development] | ||
| Line 50: | Line 52: | ||
[[category:UK]] | [[category:UK]] | ||
[[category:EnQuest]] | [[category:EnQuest]] | ||
| + | [[category:Decommissioned]] | ||
Latest revision as of 16:27, 29 May 2024
Summary Information
- Operator: EnQuest
- Country: UK
- Location: North Sea
- Production start: 2015
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The Alma/Galia fields are located in blocks 30/24c and 30/25c respectively, 310km southeast of Aberdeen, in the Central North Sea.
- The development is consisted of 7 production wells and 2 water injection/disposal wells
- Production is via the EnQuest Producer Floating Production, Storage and Offloading vessel EnQuest Producer FPSO
- The field were previously called Duncan and Argyll Oil Fields, which were closed down due to a high water cut. Improvements in technology enabled the redevelopment of the fields.
Contractors
- Technip:
- Installation of two 10” production flexible flowlines, one 8” water injection flexible flowline and one further 8” production flexible flowline,
- Installation of three 8” flexible risers,
- Installation of two production control umbilicals/risers,
- Installation of four power cables and associated dynamic risers,
- Procurement, fabrication and installation of a 175 ton manifold structure,
- Associated trenching operations, tie-ins, testing and commissioning.
- Jumbo: FPSO mooring, installation and hook-up contract
History
- 1983 - Duncan field development approved
- 1992 - Decommissioning was approved for the Duncan and Argyll Oil Fields
- 2012 - Field development approval given
- 2012 - Enquest sold a 35% stake to Kufpec
- 2012 - Technip awarded subsea contract
- 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
- 2014 - FPSO mooring spread installed
- 2015 - First oil produced
- 2020 - The fields ended production
- 2020 - Decommissioning approved
Geology
Links
- UK Oil and Gas Fields by Approval Date
- UK Oil and Gas Field Approved Decommissioning Programmes
- Technip awarded contract for EnQuest’s Alma and Galia development in UK North Sea
- EnQuest to farm out approximately £300m of the Alma/Galia development
- Jumbo main installation contractor for EnQuest Producer
- Jumbo installs North Sea FPSO mooring spread
- Alma/Galia first oil