Difference between revisions of "Centurion Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* Crude Type: | * Crude Type: | ||
− | + | === Brief Description === | |
* An oil-gathering, common carrier pipeline and storage system with approximately 2,750 miles of pipelines from southeast New Mexico across the Permian Basin of southwest Texas to Cushing, Oklahoma. | * An oil-gathering, common carrier pipeline and storage system with approximately 2,750 miles of pipelines from southeast New Mexico across the Permian Basin of southwest Texas to Cushing, Oklahoma. | ||
Line 15: | Line 15: | ||
* The pipeline also serves the [[Big Spring Refinery]] | * The pipeline also serves the [[Big Spring Refinery]] | ||
− | + | === Pipeline Status === | |
* In operation | * In operation | ||
− | + | === History === | |
* 2004 - Oxy acquired an oil-gathering and pipeline system in the Permian Basin from ExxonMobil | * 2004 - Oxy acquired an oil-gathering and pipeline system in the Permian Basin from ExxonMobil | ||
* 2007 - Centurion acquired the West Texas Pipeline System from BP | * 2007 - Centurion acquired the West Texas Pipeline System from BP | ||
* 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin | * 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin | ||
+ | * 2021 - Cushing South Pipeline project Phase I completed | ||
− | + | === Other Information | |
− | |||
* - | * - | ||
− | + | === Links === | |
+ | # [[EIA Liquids Pipeline Projects 2021-2025]] | ||
# [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet] | # [http://www.centurionpipeline.com/documents/Centurion%20Fact%20Sheet.pdf Fact Sheet] | ||
# [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin] | # [http://killajoules.wikidot.com/archive:centurion-pipeline-l-p-to-develop-new-crude-oil-tran Centurion Pipeline L.P. to Develop New Crude Oil Transportation Capacity in Permian Basin] |
Revision as of 16:06, 15 May 2024
Summary Information
- Source: southeast New Mexico
- Destination: Cushing, Oklahoma
- Ownership: Centurion Pipeline (Oxy)
- Website: http://www.centurionpipeline.com/
- Length: kilometres (2,750 miles)
- Capacity: 350,000 barrels of oil per day
- Crude Type:
Brief Description
- An oil-gathering, common carrier pipeline and storage system with approximately 2,750 miles of pipelines from southeast New Mexico across the Permian Basin of southwest Texas to Cushing, Oklahoma.
- The system has a current throughput capacity of about 350,000 barrels per day (Bpd) and 5 million barrels of active storage capability. Also, sixty-four truck unloading facilities are located at various points along the system, which allow for additional volumes to be delivered into the pipeline.
- The pipeline also serves the Big Spring Refinery
Pipeline Status
- In operation
History
- 2004 - Oxy acquired an oil-gathering and pipeline system in the Permian Basin from ExxonMobil
- 2007 - Centurion acquired the West Texas Pipeline System from BP
- 2012 - Centurion Pipeline to Develop New Crude Oil Transportation Capacity in Permian Basin
- 2021 - Cushing South Pipeline project Phase I completed
=== Other Information
- -