Difference between revisions of "Vito Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: USA * Location: Mississippi Canyon Blocks 940 & 984, Gulf of Mexico * Production start: * Partners: Shell - 55%, Statoil - 2...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Shell | * Operator: Shell | ||
* Country: USA | * Country: USA | ||
* Location: Mississippi Canyon Blocks 940 & 984, Gulf of Mexico | * Location: Mississippi Canyon Blocks 940 & 984, Gulf of Mexico | ||
− | * Production start: | + | * Production start: 2023 |
− | * Partners: Shell | + | * Partners: Shell Offshore Inc. (63.11% operator) and Equinor (36.89%) |
* Type: Oil & Gas | * Type: Oil & Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: Expected 100,000 bpd at peak |
− | + | === Description === | |
* Located over four blocks in the Mississippi Canyon area of the Gulf of Mexico, the Vito development will consist of eight subsea wells with deep (18,000 feet) in-well gas lift. | * Located over four blocks in the Mississippi Canyon area of the Gulf of Mexico, the Vito development will consist of eight subsea wells with deep (18,000 feet) in-well gas lift. | ||
* The development will utilise a semi-submersible Floating Production Unit (FPU) | * The development will utilise a semi-submersible Floating Production Unit (FPU) | ||
* Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day | * Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day | ||
+ | * The crude will be transported on the [[Mars Crude Oil Pipeline]], to which it is connected by the 51-mile, 18 inch, 120,000 bpd capacity Vito Pipeline | ||
− | + | === Contractors === | |
− | * | + | * '''Jacobs Engineering:''' Front-end engineering and design (FEED) package and detailed engineering for the Vito host platform topsides |
− | * | + | * '''Sembcorp Marine:''' Construct and integrate the hull, topsides and living quarters of the Vito semi-submersible Floating Production Unit (FPU) |
− | * | + | * '''Subsea 7:''' |
− | + | ** Project management, engineering, procurement, installation and pull-in of two 12” infield production flowlines with 10” steel catenary risers (SCRs), one gas lift flowline and SCR, and the umbilical system. | |
− | + | ** Transportation and installation of 50 miles of 18-inch oil export pipelines, 17 miles of 10-inch Gas Export pipelines and three miles of associated Steel Catenary Risers and pipeline end terminations | |
− | * | + | * '''Oceaneering:''' electro-hydraulic steel tube control umbilical, and flying leads, totaling approximately nine kilometers (5.6 miles) in length |
− | + | === History === | |
* 2009 - Vito Oil Field discovered | * 2009 - Vito Oil Field discovered | ||
* 2010 - Appraisal wells drilled | * 2010 - Appraisal wells drilled | ||
+ | * 2014 - Statoil acquired Anadarko's share | ||
* 2016 - Jacobs awarded FEED contract | * 2016 - Jacobs awarded FEED contract | ||
* 2018 - Final investment decision | * 2018 - Final investment decision | ||
+ | * 2023 - First oil produced | ||
− | + | === Geology === | |
* 600 net feet of high-quality oil pay in thick subsalt Miocene sands | * 600 net feet of high-quality oil pay in thick subsalt Miocene sands | ||
− | + | === Links === | |
# [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] | # [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] | ||
+ | # [[EIA Liquids Pipeline Projects 2021-2025]] | ||
# [http://killajoules.wikidot.com/archive:anadarko-announces-its-fourth-deepwater-gulf-of-mexi Anadarko Announces Its Fourth Deepwater Gulf of Mexico Discovery in 2009] | # [http://killajoules.wikidot.com/archive:anadarko-announces-its-fourth-deepwater-gulf-of-mexi Anadarko Announces Its Fourth Deepwater Gulf of Mexico Discovery in 2009] | ||
# [http://killajoules.wikidot.com/archive:anadarko-provides-deepwater-update Anadarko Provides Deepwater Update] | # [http://killajoules.wikidot.com/archive:anadarko-provides-deepwater-update Anadarko Provides Deepwater Update] | ||
Line 41: | Line 45: | ||
# [http://killajoules.wikidot.com/archive:shell-invests-in-the-vito-development-in-the-gulf-of Shell invests in the Vito development in the Gulf of Mexico] | # [http://killajoules.wikidot.com/archive:shell-invests-in-the-vito-development-in-the-gulf-of Shell invests in the Vito development in the Gulf of Mexico] | ||
# [http://killajoules.wikidot.com/archive:export-pipelines-award-demonstrates-subsea-7s-strong Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.] | # [http://killajoules.wikidot.com/archive:export-pipelines-award-demonstrates-subsea-7s-strong Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.] | ||
+ | # [https://abarrelfull.blogspot.com/2023/11/shell-starts-production-at-vito-in-us.html Shell starts production at Vito in US Gulf of Mexico] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:USA]] | ||
+ | [[category:Shell]] | ||
+ | [[category:Equinor]] |
Latest revision as of 11:30, 15 May 2024
Summary Information
- Operator: Shell
- Country: USA
- Location: Mississippi Canyon Blocks 940 & 984, Gulf of Mexico
- Production start: 2023
- Partners: Shell Offshore Inc. (63.11% operator) and Equinor (36.89%)
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: Expected 100,000 bpd at peak
Description
- Located over four blocks in the Mississippi Canyon area of the Gulf of Mexico, the Vito development will consist of eight subsea wells with deep (18,000 feet) in-well gas lift.
- The development will utilise a semi-submersible Floating Production Unit (FPU)
- Vito is expected to reach peak production of approximately 100,000 barrels of oil equivalent (boe) per day
- The crude will be transported on the Mars Crude Oil Pipeline, to which it is connected by the 51-mile, 18 inch, 120,000 bpd capacity Vito Pipeline
Contractors
- Jacobs Engineering: Front-end engineering and design (FEED) package and detailed engineering for the Vito host platform topsides
- Sembcorp Marine: Construct and integrate the hull, topsides and living quarters of the Vito semi-submersible Floating Production Unit (FPU)
- Subsea 7:
- Project management, engineering, procurement, installation and pull-in of two 12” infield production flowlines with 10” steel catenary risers (SCRs), one gas lift flowline and SCR, and the umbilical system.
- Transportation and installation of 50 miles of 18-inch oil export pipelines, 17 miles of 10-inch Gas Export pipelines and three miles of associated Steel Catenary Risers and pipeline end terminations
- Oceaneering: electro-hydraulic steel tube control umbilical, and flying leads, totaling approximately nine kilometers (5.6 miles) in length
History
- 2009 - Vito Oil Field discovered
- 2010 - Appraisal wells drilled
- 2014 - Statoil acquired Anadarko's share
- 2016 - Jacobs awarded FEED contract
- 2018 - Final investment decision
- 2023 - First oil produced
Geology
- 600 net feet of high-quality oil pay in thick subsalt Miocene sands
Links
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- EIA Liquids Pipeline Projects 2021-2025
- Anadarko Announces Its Fourth Deepwater Gulf of Mexico Discovery in 2009
- Anadarko Provides Deepwater Update
- Jacobs Wins Contract from Shell for Gulf of Mexico Platform
- Sembcorp Marine Secures Contract for the Construction and Integration of Vito FPU’s Hull, Topsides and Living Quarters
- Subsea 7 awarded contract offshore Gulf of Mexico
- Oceaneering Announces Subsea 7 Umbilical Contract for Shell's Vito Development in the Gulf of Mexico
- Shell invests in the Vito development in the Gulf of Mexico
- Export pipelines award demonstrates Subsea 7’s strong track record for cost-effective execution in the US Gulf of Mexico.
- Shell starts production at Vito in US Gulf of Mexico