Difference between revisions of "Pluto Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
Operator: Woodside
+
* Operator: Woodside
Country: Australia
+
* Country: Australia
Location: 190 kilometers northwest of Karratha, offshore Western Australia
+
* Location: 190 kilometers northwest of Karratha, offshore Western Australia
Production start: 2012
+
* Production start: 2012
Partners:
+
* Partners:
Type: Gas
+
* Type: Gas
Estimated Reserves:
+
* Estimated Reserves:
Production Volume:
+
* Production Volume:
Description
 
  
Gas from the field is used to supply the Pluto LNG Terminal
+
=== Description ===
The offshore platform is a four-leg extended base tower with a launch weight of 10,000 metric tons
 
Contractors
 
  
CSE: Pluto Jacket
+
* Gas from the field is used to supply the [[Pluto LNG Terminal]]
Ramunia: Topsides fabrication
+
* The Pluto A Platform is a not-normally manned platform, located 180 kilometres north-west of Karratha in 85 metres of water. It is a four-leg extended base tower with a launch weight of 10,000 metric tons.
TH Heavy Engineering: Topsides fabrication
+
* The Xena gas field is a satellite of Pluto.
J. Ray McDermott: Installation engineering, transportation and installation of the complete platform
+
* Gas from the fields is piped through a trunkline to the onshore facility.
FMC Technologies: Five subsea trees, related control and tie-in systems and two production manifolds
+
* A third Xena well is being added
Acergy: installation of subsea manifolds, valve structures, umbilicals, a monoethylene glycol injection line and pipeline stabilisation as well as the tie-in of flowlines
 
Aker Solutions: Hydrate Inhibition, Conceptual Study & FEED
 
History
 
  
2005 - Pluto Gas Field discovered
+
=== Contractors ===
2007 - FMC Technologies awarded subsea equipment contract
+
 
2008 - J. Ray McDermott awarded platform contract
+
* CSE: Pluto Jacket
2008 - Acergy awarded offshore installation contract
+
* Ramunia: Topsides fabrication
2012 - Gas production starts
+
* TH Heavy Engineering: Topsides fabrication
Geology
+
* J. Ray McDermott: Installation engineering, transportation and installation of the complete platform
 +
* FMC Technologies: Five subsea trees, related control and tie-in systems and two production manifolds
 +
* Acergy: installation of subsea manifolds, valve structures, umbilicals, a monoethylene glycol injection line and pipeline stabilisation as well as the tie-in of flowlines
 +
* Aker Solutions: Hydrate Inhibition, Conceptual Study & FEED
 +
 
 +
=== History ===
 +
 
 +
* 2005 - Pluto Gas Field discovered
 +
* 2007 - FMC Technologies awarded subsea equipment contract
 +
* 2008 - J. Ray McDermott awarded platform contract
 +
* 2008 - Acergy awarded offshore installation contract
 +
* 2012 - Gas production starts
 +
* 2024 - TechnipFMC awarded contract for Xena 3
 +
 
 +
=== Geology ===
  
 
=== Links ===
 
=== Links ===
 
+
# [[Aker Solutions Hydrate Inhibition References]]
 +
# [[International Protective Coatings Fixed Platform References]]
 
# [[McDermott Platform References]]
 
# [[McDermott Platform References]]
 +
# [[Shenzhen Chiwan Sembawang Engineering Platform References]]
 
# [[TH Heavy Engineering Platform References]]
 
# [[TH Heavy Engineering Platform References]]
# [[Aker Solutions Hydrate Inhibition References]]
+
# [http://killajoules.wikidot.com/archive:fmc-technologies-to-supply-subsea-system-for-woodsid FMC Technologies to Supply Subsea System for Woodside's Pluto Project, Offshore Western Australia]
# [[International Protective Coatings Fixed Platform References]]
+
# [http://killajoules.wikidot.com/archive:acergy-s-a-announces-150-million-deepwater-contract Acergy S.A. announces $150 million deepwater contract award in Australia]
# FMC Technologies to Supply Subsea System for Woodside's Pluto Project, Offshore Western Australia
+
# [http://killajoules.wikidot.com/archive:j-ray-mcdermott-awarded-pluto-offshore-platform-cont J. Ray McDermott Awarded Pluto Offshore Platform Contract]
# Acergy S.A. announces $150 million deepwater contract award in Australia
+
# [http://killajoules.wikidot.com/blog:2447 Pluto Begins LNG Production]
# J. Ray McDermott Awarded Pluto Offshore Platform Contract
 
Pluto Begins LNG Production
 
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-significant_16.html TechnipFMC Awarded Significant Integrated EPCI Contract for Woodside’s Pyxis Field in Australia]
 
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-significant_16.html TechnipFMC Awarded Significant Integrated EPCI Contract for Woodside’s Pyxis Field in Australia]
 +
# [https://a-barrel-full.blogspot.com/2024/05/technipfmc-awarded-significant-iepci.html TechnipFMC Awarded Significant iEPCI™ Contract by Woodside Energy for Xena Phase 3 Development]
 +
 +
[[category:Field]]
 +
[[category:Australia]]
 +
[[category:Woodside]]

Latest revision as of 12:49, 14 May 2024

Summary Information

  • Operator: Woodside
  • Country: Australia
  • Location: 190 kilometers northwest of Karratha, offshore Western Australia
  • Production start: 2012
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Gas from the field is used to supply the Pluto LNG Terminal
  • The Pluto A Platform is a not-normally manned platform, located 180 kilometres north-west of Karratha in 85 metres of water. It is a four-leg extended base tower with a launch weight of 10,000 metric tons.
  • The Xena gas field is a satellite of Pluto.
  • Gas from the fields is piped through a trunkline to the onshore facility.
  • A third Xena well is being added

Contractors

  • CSE: Pluto Jacket
  • Ramunia: Topsides fabrication
  • TH Heavy Engineering: Topsides fabrication
  • J. Ray McDermott: Installation engineering, transportation and installation of the complete platform
  • FMC Technologies: Five subsea trees, related control and tie-in systems and two production manifolds
  • Acergy: installation of subsea manifolds, valve structures, umbilicals, a monoethylene glycol injection line and pipeline stabilisation as well as the tie-in of flowlines
  • Aker Solutions: Hydrate Inhibition, Conceptual Study & FEED

History

  • 2005 - Pluto Gas Field discovered
  • 2007 - FMC Technologies awarded subsea equipment contract
  • 2008 - J. Ray McDermott awarded platform contract
  • 2008 - Acergy awarded offshore installation contract
  • 2012 - Gas production starts
  • 2024 - TechnipFMC awarded contract for Xena 3

Geology

Links

  1. Aker Solutions Hydrate Inhibition References
  2. International Protective Coatings Fixed Platform References
  3. McDermott Platform References
  4. Shenzhen Chiwan Sembawang Engineering Platform References
  5. TH Heavy Engineering Platform References
  6. FMC Technologies to Supply Subsea System for Woodside's Pluto Project, Offshore Western Australia
  7. Acergy S.A. announces $150 million deepwater contract award in Australia
  8. J. Ray McDermott Awarded Pluto Offshore Platform Contract
  9. Pluto Begins LNG Production
  10. TechnipFMC Awarded Significant Integrated EPCI Contract for Woodside’s Pyxis Field in Australia
  11. TechnipFMC Awarded Significant iEPCI™ Contract by Woodside Energy for Xena Phase 3 Development