Difference between revisions of "Oudna Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Lundin Petroleum * Country: Tunisia * Location: 80 km off the coast of north eastern Tunisia in the eastern part of the Gulf of Hammamet * Prod...") |
Abarrelfull (talk | contribs) |
||
Line 5: | Line 5: | ||
* Production start: 2006 | * Production start: 2006 | ||
* Partners: | * Partners: | ||
− | + | ** Lundin Petroleum - 40% | |
− | + | ** Atlantis Holding Norway AS - 40% | |
− | + | ** ETAP - 20% | |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: |
Revision as of 19:37, 2 March 2024
Summary Information
- Operator: Lundin Petroleum
- Country: Tunisia
- Location: 80 km off the coast of north eastern Tunisia in the eastern part of the Gulf of Hammamet
- Production start: 2006
- Partners:
- Lundin Petroleum - 40%
- Atlantis Holding Norway AS - 40%
- ETAP - 20%
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume: 20,000 bopd
* Initial production from natural flow is over 8,000 bopd
+++ Description
- The Oudna field consists of a single production well supported by a single water injection well, both tied back to the [[[Ikdam FPSO]]].
- Reservoir pressure is maintained by water injection and artificial lift is provided by a crude oil powered jet-pump.
+++ Contractors
- **Petrofac:** Engineering, procurement and project management of all subsea hardware, and process, vessel and mooring system modifications required to convert the Ikdam FPSO vessel and install it for service on the Oudna field
- **Aker:** Installation of mooring system, flexible risers and umbilicals
+++ History
- 1978 - Discovered by Shell Tunirex
- 2005 - Petrofac awarded contracts for Oudna Development
- 2006 - Production starts
- 2007 - ETAP, the Tunisian state oil company,decided to exercise its participation option to acquire a 20 percent interest
+++ Geology
+++ Links