Difference between revisions of "Volgograd Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Lukoil * Website: http://www.lukoil.com/ * List of Lukoil Refineries * Location: Volvograd, Southern Russia * Capacity: 11.25 mill...") |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
=== Crude Supply === | === Crude Supply === | ||
* Crude oil is supplied to the Refinery via the [[Samara – Tikhoretsk Pipeline]] | * Crude oil is supplied to the Refinery via the [[Samara – Tikhoretsk Pipeline]] | ||
− | === Products Produced | + | === Products Produced === |
− | * Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel | + | * Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel, Bitumen |
+ | |||
=== Projects === | === Projects === | ||
+ | * In 2016 an upgrading project was completed | ||
+ | * The project replaced old units and increased the capacity of the refinery | ||
* For full details see [[Volgograd Refinery Project]] | * For full details see [[Volgograd Refinery Project]] | ||
− | + | ||
− | |||
− | |||
=== Other Information === | === Other Information === | ||
- | - | ||
Line 38: | Line 39: | ||
* In 2008 the vacuum block on distillation unit №6 was commissioned after an upgrade. The Refinery switched to production of motor gasolines to Euro-3 standard. | * In 2008 the vacuum block on distillation unit №6 was commissioned after an upgrade. The Refinery switched to production of motor gasolines to Euro-3 standard. | ||
* In 2009 a unit for production of inert gas was brought into operation and a steam recuperation unit was commissioned at the oil loading rack. EKTO diesel fuel production was started. | * In 2009 a unit for production of inert gas was brought into operation and a steam recuperation unit was commissioned at the oil loading rack. EKTO diesel fuel production was started. | ||
+ | * 2018 - A new terminal for the loading of bitumen products and lubricants was opened | ||
+ | |||
=== Links === | === Links === | ||
# [http://www.lukoil.com/materials/images/Refining/2009/СА_33-43_eng.pdf Lukoil Refinery Facts] | # [http://www.lukoil.com/materials/images/Refining/2009/СА_33-43_eng.pdf Lukoil Refinery Facts] | ||
# [[Giprogazoochistka Refinery References]] | # [[Giprogazoochistka Refinery References]] | ||
# [[Globalstroy Engineering Refinery References]] | # [[Globalstroy Engineering Refinery References]] | ||
− | # [[ | + | # [[ORGHIM Refinery References]] |
+ | # [http://killajoules.wikidot.com/archive:lukoil-opens-petroleum-products-loading-terminal-in Lukoil Opens Petroleum Products Loading Terminal In Volgograd] | ||
+ | # [http://killajoules.wikidot.com/archive:lukoil-begins-production-of-low-sulfur-fuel-oil-meet Lukoil Begins Production Of Low-Sulfur Fuel Oil Meeting Requirements Of Marpol Convention] | ||
[[Category:Refinery]] | [[Category:Refinery]] | ||
[[Category:Russia]] | [[Category:Russia]] | ||
[[Category:Lukoil]] | [[Category:Lukoil]] |
Latest revision as of 15:25, 7 February 2024
Contents
Summary Information
- Ownership: Lukoil
- Website: http://www.lukoil.com/
- List of Lukoil Refineries
- Location: Volvograd, Southern Russia
- Capacity: 11.25 million tons/annum & 225.000 bbl/day
- Nelson Complexity: 6.9
Refining Units
- Crude distillation 225 bpd
- Vacuum distillation 68.2 bpd
- Coking 18.5 bpd
- Catalytic reforming 43.7 bpd
- Catalytic hydrotreating 95.9 bpd
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Crude oil is supplied to the Refinery via the Samara – Tikhoretsk Pipeline
Products Produced
- Gasoline, Diesel, Lubricants, Fuel oil, Jet fuel, Bitumen
Projects
- In 2016 an upgrading project was completed
- The project replaced old units and increased the capacity of the refinery
- For full details see Volgograd Refinery Project
Other Information
-
History
- 1957 - The Refinery was put into operation
- 1973 - Crude oil processing unit added
- 1979 - Sulfur recovery unit commissioned
- 1991 - the Refinery entered LUKOIL Group
- 1994 - equipment for crude distillation and gasoline reforming was rebuilt.
- 1997–1998 the Refinery launched automatic equipment for blending of gasolines and a rail trestle for crude oil discharge
- In 1998–2001 the Refinery launched equipment for hydrotreatment of diesel fuel, naphta stabilization and fractioning of saturated hydrocarbon gases.
- 2004–2006 the first stage of a coke calcination facility was completed. The Refinery completed construction of a catalytic reforming unit.
- In 2007 an isomerization unit with annual capacity of 380,000 tons was commissioned.
- In 2008 the vacuum block on distillation unit №6 was commissioned after an upgrade. The Refinery switched to production of motor gasolines to Euro-3 standard.
- In 2009 a unit for production of inert gas was brought into operation and a steam recuperation unit was commissioned at the oil loading rack. EKTO diesel fuel production was started.
- 2018 - A new terminal for the loading of bitumen products and lubricants was opened