Difference between revisions of "Seth Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: * Country: Egypt * Location: 60km offshore in the Ras El Bar concession in the East Nile Delta Mediterranean * Production start: 2012 * Partn...") |
Abarrelfull (talk | contribs) |
||
| Line 27: | Line 27: | ||
+++ Links | +++ Links | ||
| − | # [[ | + | # [[ENPPI Offshore Platform References]] |
# [[FoundOcean Subsea References]] | # [[FoundOcean Subsea References]] | ||
# [[Saipem Fixed Offshore Production Facilities Project References]] | # [[Saipem Fixed Offshore Production Facilities Project References]] | ||
# [http://killajoules.wikidot.com/blog:2729 BP Egypt Announces Seth First Gas] | # [http://killajoules.wikidot.com/blog:2729 BP Egypt Announces Seth First Gas] | ||
Latest revision as of 07:28, 31 January 2024
Summary Information
- Operator:
- Country: Egypt
- Location: 60km offshore in the Ras El Bar concession in the East Nile Delta Mediterranean
- Production start: 2012
- Partners: BP, ENI
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Seth field is located 60km offshore in the Ras El Bar concession in the East Nile Delta Mediterranean, close to existing producing Ha'py and Denise fields.
- Seth is being developed with a 6 well slot, normally unmanned platform with gas being exported via the Denise (Pliocene) pipeline to El Gamil gas terminal near Port Said.
- The first two wells accessing the western part of the Seth reservoir are expected to reach 170 mmscfd and develop about 240 bcf of gas.
+++ Contractors
- **Saipem:** Transport and Installation of the platform
- **Enppi / Petrojet / Tecnomare:** Detailed engineering for topside facilities, procurement services and material supply and assistance for commissioning and startup
- **FoundOcean:** Grouting
+++ History
- 2012 - Seth field production starts
+++ Geology
+++ Links