Difference between revisions of "Riyas Natural Gas Liquids Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 24: | Line 24: | ||
=== Links === | === Links === | ||
| − | # [ ] | + | # [https://a-barrel-full.blogspot.com/2024/01/tecnicas-reunidas-and-sinopec-awarded.html Técnicas Reunidas and Sinopec awarded two contracts by Saudi Aramco for more than 3,3 billion USD] |
[[category:Processing]] | [[category:Processing]] | ||
[[category:Saudi Arabia]] | [[category:Saudi Arabia]] | ||
[[category:Saudi Aramco]] | [[category:Saudi Aramco]] | ||
Revision as of 11:00, 22 January 2024
Contents
Summary Information
- Ownership: Saudi Aramco
- Website:
- Location:
- Capacity: 510,000 bpd
Brief Description
- The plant will consist of 2 fractionation trains of 255,000 bpd each
- It will produce ethane, propane, butane and pentane
Related Oil and Gas Fields
- The plant will process NGLs from the Jafurah Shale Gas Field
Ongoing Projects
- The plant is under construction
- Tecnicas Reunidas and Sinopec were awarded EPC contracts for the Fractionation Trains and the Common Facilities, which includes utilities, storage and export facilities
Other Information
- -
History
- 2024 - Tecnicas Reunidas and Sinopec awarded EPC contracts