Difference between revisions of "Chinarevskoye Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 22: | Line 22: | ||
=== History === | === History === | ||
* 2011 - The first 2 trains of the plant began operations | * 2011 - The first 2 trains of the plant began operations | ||
+ | * 2017 - The 3rd train was completed | ||
* 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | ||
+ | * 2023 - The plant began processing gas from Rozhkovskoye | ||
=== Links === | === Links === | ||
+ | # [[KazStroyService Oil And Gas Processing References]] | ||
+ | # [http://adal-profi.kz/eng/ustanovka-kompleksnoj-podgotovki-gaza-3-na-chinarevskom-mestorozhdenii/ ADAL PROFI, Chinarevskoye] | ||
# [https://abarrelfull.blogspot.com/2024/01/binding-agreement-with-ural-oil-gas-llp.html Binding agreement with Ural Oil & Gas LLP] | # [https://abarrelfull.blogspot.com/2024/01/binding-agreement-with-ural-oil-gas-llp.html Binding agreement with Ural Oil & Gas LLP] | ||
[[category:Processing]] | [[category:Processing]] | ||
− | [[category: | + | [[category:Kazakhstan]] |
[[category:Nostrum]] | [[category:Nostrum]] |
Latest revision as of 15:45, 21 January 2024
Contents
Summary Information
- Ownership: Nostrum
- Website: https://www.nostrumoilandgas.com/
- Location: North West Kazakhstan
- Capacity: 4.2 BCM per annum
Brief Description
- The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas.
- The plant has three trains.
Related Oil and Gas Fields
Ongoing Projects
- -
Other Information
- -
History
- 2011 - The first 2 trains of the plant began operations
- 2017 - The 3rd train was completed
- 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field
- 2023 - The plant began processing gas from Rozhkovskoye