Difference between revisions of "Chinarevskoye Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 7: | Line 7: | ||
=== Brief Description === | === Brief Description === | ||
| − | * | + | * The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas. |
| + | * The plant has three trains. | ||
=== Related Oil and Gas Fields === | === Related Oil and Gas Fields === | ||
| Line 20: | Line 21: | ||
=== History === | === History === | ||
| + | * 2011 - The first 2 trains of the plant began operations | ||
* 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | * 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field | ||
| Line 27: | Line 29: | ||
[[category:Processing]] | [[category:Processing]] | ||
[[category:Country]] | [[category:Country]] | ||
| − | [[category: | + | [[category:Nostrum]] |
Revision as of 09:50, 17 January 2024
Contents
Summary Information
- Ownership: Nostrum
- Website: https://www.nostrumoilandgas.com/
- Location: North West Kazakhstan
- Capacity: 4.2 BCM per annum
Brief Description
- The Gas Treatment Facility (GTF) treats gas condensate from thes wells as well as associated gas from the Oil Treatment Unit (OTU) into a mix of new products, i.e. stabilised condensate, LPG and dry gas.
- The plant has three trains.
Related Oil and Gas Fields
Ongoing Projects
- -
Other Information
- -
History
- 2011 - The first 2 trains of the plant began operations
- 2018 - Nostrum signed agreement to process gas from Rozhkovskoye Field