Difference between revisions of "Kazakhstan IPCI Petrochemical Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 19: | Line 19: | ||
* 2017 – Groundbreaking ceremony | * 2017 – Groundbreaking ceremony | ||
* 2020 - Major equipment installed | * 2020 - Major equipment installed | ||
+ | * 2021 - Propane supply contract signed | ||
* 2022 - KMG acquired 49.5% from Samruk-Kazyna JSC | * 2022 - KMG acquired 49.5% from Samruk-Kazyna JSC | ||
* 2022 - Production starts | * 2022 - Production starts | ||
Line 30: | Line 31: | ||
# [https://abarrelfull.blogspot.com/2024/01/transaction-completed-on-acquisition-of.html Transaction Completed on Acquisition of Interest in Kazakhstan Petrochemical Industries Inc.] | # [https://abarrelfull.blogspot.com/2024/01/transaction-completed-on-acquisition-of.html Transaction Completed on Acquisition of Interest in Kazakhstan Petrochemical Industries Inc.] | ||
# [https://abarrelfull.blogspot.com/2023/10/president-launches-gas-chemical-complex.html President Launches Gas Chemical Complex in Atyrau Region] | # [https://abarrelfull.blogspot.com/2023/10/president-launches-gas-chemical-complex.html President Launches Gas Chemical Complex in Atyrau Region] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/kmg-and-tco-agree-to-supply-propane-to.html KMG and TCO Agree to Supply Propane to Kazakhstan’s First Gas Chemical Complex] | ||
Latest revision as of 18:32, 13 January 2024
Summary Information
- Owner: KPI (Kazakhstan Petrochemical Industries)
- Website: https://www.kpi.kz/en/
- Location: Aytaru, Kazakhstan
- Completion: 2022
Project Details
- The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology.
- Propane is supplied from the Tengiz Oil Field
Contractors
- Hualu Engineering & Technology Co: Construction
- CB&I: process licences
History
- 2013 – Petrofac consortium awarded EPC contract
- 2017 – CB&I awarded process licences
- 2017 – Groundbreaking ceremony
- 2020 - Major equipment installed
- 2021 - Propane supply contract signed
- 2022 - KMG acquired 49.5% from Samruk-Kazyna JSC
- 2022 - Production starts
Links
- Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan
- CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan
- The Groundbreaking Ceremony of IPCI project in Kazakhstan
- Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place
- Transaction Completed on Acquisition of Interest in Kazakhstan Petrochemical Industries Inc.
- President Launches Gas Chemical Complex in Atyrau Region
- KMG and TCO Agree to Supply Propane to Kazakhstan’s First Gas Chemical Complex