Difference between revisions of "Kazakhstan IPCI Petrochemical Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
* Website: https://www.kpi.kz/en/ | * Website: https://www.kpi.kz/en/ | ||
* Location: Aytaru, Kazakhstan | * Location: Aytaru, Kazakhstan | ||
− | * Completion: 2022 | + | * Completion: 2022 |
=== Project Details === | === Project Details === | ||
* The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology. | * The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology. | ||
− | * | + | * Propane is supplied from the [[Tengiz Oil Field]] |
=== Contractors === | === Contractors === | ||
− | Hualu Engineering & Technology Co: Construction | + | * Hualu Engineering & Technology Co: Construction |
− | CB&I: process licences | + | * CB&I: process licences |
+ | |||
=== History === | === History === | ||
− | 2013 – Petrofac consortium awarded EPC contract | + | * 2013 – Petrofac consortium awarded EPC contract |
− | 2017 – CB&I awarded process licences | + | * 2017 – CB&I awarded process licences |
− | 2017 – | + | * 2017 – Groundbreaking ceremony |
+ | * 2020 - Major equipment installed | ||
+ | * 2021 - Propane supply contract signed | ||
+ | * 2022 - KMG acquired 49.5% from Samruk-Kazyna JSC | ||
+ | * 2022 - Production starts | ||
+ | |||
+ | |||
=== Links === | === Links === | ||
− | Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan | + | # [https://abarrelfull.blogspot.com/2020/10/petrofac-consortium-appointed-by-klpe.html Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan] |
− | CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan | + | # [https://abarrelfull.blogspot.com/2020/10/cb-receives-full-notice-to-proceed-for.html CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan] |
− | The Groundbreaking Ceremony of IPCI project in Kazakhstan | + | # [https://abarrelfull.blogspot.com/2020/10/the-groundbreaking-ceremony-of-ipci.html The Groundbreaking Ceremony of IPCI project in Kazakhstan] |
− | Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place | + | # [https://abarrelfull.blogspot.com/2020/10/propane-propylene-splitter-of-pdh-plant.html Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place] |
+ | # [https://abarrelfull.blogspot.com/2024/01/transaction-completed-on-acquisition-of.html Transaction Completed on Acquisition of Interest in Kazakhstan Petrochemical Industries Inc.] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/president-launches-gas-chemical-complex.html President Launches Gas Chemical Complex in Atyrau Region] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/kmg-and-tco-agree-to-supply-propane-to.html KMG and TCO Agree to Supply Propane to Kazakhstan’s First Gas Chemical Complex] | ||
+ | |||
+ | |||
+ | [[category:Petrochemical]] | ||
+ | [[category:Kazakhstan]] | ||
+ | [[category:KMG]] |
Latest revision as of 18:32, 13 January 2024
Summary Information
- Owner: KPI (Kazakhstan Petrochemical Industries)
- Website: https://www.kpi.kz/en/
- Location: Aytaru, Kazakhstan
- Completion: 2022
Project Details
- The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology.
- Propane is supplied from the Tengiz Oil Field
Contractors
- Hualu Engineering & Technology Co: Construction
- CB&I: process licences
History
- 2013 – Petrofac consortium awarded EPC contract
- 2017 – CB&I awarded process licences
- 2017 – Groundbreaking ceremony
- 2020 - Major equipment installed
- 2021 - Propane supply contract signed
- 2022 - KMG acquired 49.5% from Samruk-Kazyna JSC
- 2022 - Production starts
Links
- Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan
- CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan
- The Groundbreaking Ceremony of IPCI project in Kazakhstan
- Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place
- Transaction Completed on Acquisition of Interest in Kazakhstan Petrochemical Industries Inc.
- President Launches Gas Chemical Complex in Atyrau Region
- KMG and TCO Agree to Supply Propane to Kazakhstan’s First Gas Chemical Complex